6. Attach the shrouds and D2
main
. Ensure that all the shrouds are
. Tie a bowline in the jib
t the winch hook
tach the hook to the
1. Pull in the slack on the jib halyard.
2.Tie a safety knot in the jib
cleat.
3. Ensure that the cleat is in the
ar of
rd is
5. The Winch strap must be positioned on
shrouds. The lowers should re
off at this stage.
7
in their terminals.
8
halyard.
9. Pull ou
until the hook is reaching
the middle of the granny
rails.
10. At
jib halyard.
1
1
halyard close to the spin lock
1
cleated position, AND THE KNOT IS
CLOSE TO THE CLEAT.
14. Check the rigging is cle
obstructions and that the jib halya
not rapped around anything.
1
the starboard side of the gennaker pole.
Summary of Contents for SB3
Page 1: ...RIGGING MANUAL ...