Step 11. Glue top Newel post to front of handrail and top
tread. Figure 11 repeat steps for second floor stairs. Paint
and let dry.
Figure 11
Figure 12
Step 12. assemble side long safety stair rails
(x2), using 5 spindles evenly spaced along the
rail and mark. Next glue to handrail. Figures 12
and 13.
Figure 13