Step 33. Divide all porch trim into pairs by pairing 
top and bottom rails by length. You should end 
up with 3 single bottom rails. All other should be 
paired up, the longest set will divide up into the 
first floor top rail over the steps and the bottom 
rail for the second floor between alcoves. Now 
using the engraved marks on the first floor divide 
up into there prospective sections and move 
forward with post placement. Starting at one end 
glue a bottom rail to two post and install to the 
first floor. Use the engraved marks as post 
position reference. Figure 36.

 DO NOT GLUE TOP 

OF POST TO SECOND FLOOR.  

Figure 36 

Figure 37 

Figure 38 

Step 34. Using front installed post continue 
installing post on side of house. Remember 
do not glue to ceiling. Figure 38

 

Summary of Contents for Tiffany Victorian

Page 1: ...Tiffany Victorian assembly instructions By Laser Dollhouse Designs ...

Page 2: ...ed Subfloor support rails Interior exterior walls First floor 1A thru 1M Second Floor 2A thru 2N Third Floor 3A thru 3E Porch frames and rails Porch Posts 15 long 3 short Alcove roof panels Main roof panels Window Frames Front porch stair assembly Interior stair safety rails comes unassembled Set of two long and one short 13 spindles 6 rails Shingles Alcove roof trim Main roof trim ...

Page 3: ... Materials for build 1 Wood glue you may use Titebond elmers or any good wood glue 2 Masking tape to hold house in place during assembly and gluing 3 Utility knife for cutting out shingles and forming exterior frames after shingling roof 4 200 300 grit sandpaper 5 Alcohol for cleaning laser burn areas and post optional 6 Your choice of paint recommend spray paint and a spray sealer for small items...

Page 4: ... DRY ASSEMBLY Once dry assembly completed prep paint wallpaper and stain all items for assembly and glue in place Step 1 Locate base floor and support rails turn base upside down and insert support rail skirts See figure 1 Figure 1 Figure 2 Step 2 SKIP STEP IF DRY ASSEMBLING Install interior window frames when installing place frame on interior side and align to where you see equal amount of frame...

Page 5: ...Step 3 Install Interior and exterior doors to walls and frames See figure 3 ONLY GLUE IN FINAL ASSEMBLY Figure 3 Figure 4 Step 4 Install walls 1A thru 1M to assembled first floor base See figure 4 ...

Page 6: ...Step 5 Install second floor on to the first floor walls Figure 5 Figure 5 Figure 6 Step 6 Stairs assembly locate stair case The bottom riser step is the side with the square dowel Figure 6 Bottom Top ...

Page 7: ...ide Make sure to glue in place with the square cutouts to the right for your spindles Figure 7 Figure 7 Figure 8 Step 8 Install the spindles with the slop facing back As in Figure 8 seat the spindles firmly within the square cutouts They should seat to the first bottom grove in the spindle ...

Page 8: ...e centered Figure 9 Figure 9 Figure 10 Step 10 Install the handrail First glue to lower newel post view rail angle to spindles and starting from the bottom glue each spindle to rail Adjust to rail angle Do not push rail to spindle as this will result in your rail not being straight Adjust spindle angle by prushing fwd or back to change angle Figure 10 ...

Page 9: ...nd top tread Figure 11 repeat steps for second floor stairs Paint and let dry Figure 11 Figure 12 Step 12 assemble side long safety stair rails x2 using 5 spindles evenly spaced along the rail and mark Next glue to handrail Figures 12 and 13 Figure 13 ...

Page 10: ...e 15 Step 14 Using 3 spindles repeat steps to assemble as you did earlier Figure 15 you should now have one short and two long sets of safety rails Figure 16 Step 15 Install 3 newel post forming an L shape with the small run to the left third Floors and 2 newel post forming one rail for the second floor See figure 16 paint and let dry ...

Page 11: ...air assembly figure 17 Figure 17 Figure 18 Step 17 Apply treads with cutouts evenly across each step Figure 18 Figure 19 Step 18 Install stair spindles with angle towards front Figure 19 make sure each one seat in the cutout ...

Page 12: ...d aligned to edge of stair assembly centered with spindles Figure 20 Figure 20 Figure 21 Step 20 Install handrails by gluing to newel post and centering onto spindles Figure 21 paint and let dry Figure 22 Step 21 Install stairs glue even to floor so that it is flush Figure 22 ...

Page 13: ...un safety rail and the second floors walls Figure 23 Make sure all doors door frames and windows are installed prior to gluing Figure 23 Figure 24 Step 23 Install third floor onto second floor walls glue and let dry Figure 24 ...

Page 14: ...Step 24 Install stairs and glue flush to third floor Figure 25 Figure 25 Figure 26 Step 25 Using wall 3A as reference install L shaped safety rail aligning to wall and front of stair post Figure 26 ...

Page 15: ...ll 3rd floor walls 3A 3B and 3C Figure 27 Make sure doors door frames and windows and installed prior to gluing Figure 27 Figure 28 Step 27 Install main roof panels front and rear and glue third floor down Figure 28 ...

Page 16: ... floor walls 3D and 3E figure 30 Figure 30 Figure 31 Step 29 Install front Alcove roof panels and glue down in place Figure 31 From the inside align alcove panels to main roof opening and glue in place Figure 32 Figure 32 ...

Page 17: ...Step 30 Install Main roof running trim Figure 33 Figure 33 Figure 34 Step 31 Install front Alcove roof gables Figure 34 Figure 35 Step 32 Install main roof side gables Figure 35 ...

Page 18: ...r between alcoves Now using the engraved marks on the first floor divide up into there prospective sections and move forward with post placement Starting at one end glue a bottom rail to two post and install to the first floor Use the engraved marks as post position reference Figure 36 DO NOT GLUE TOP OF POST TO SECOND FLOOR Figure 36 Figure 37 Figure 38 Step 34 Using front installed post continue...

Page 19: ...ht This is the porch opening for the porch stairs Figure 39 Figure 39 Figure 40 Step 36 Continue installing porch assembly until all post and rails are installed Figure 40 Now lay house on side and apply small amount of superglue to top of post figure 41 and press together Figure 41 ...

Page 20: ...e second floor two post with a bottom rail figure 42 and continue around the side applying the side post and rails Figure 43 Figure 42 Figure 43 Step 38 Install single long bottom rail and post starting assembly to the right Figure 44 Figure 44 ...

Page 21: ...inue with porch post assembly installing last large post and upper lower rails Figure 45 Figure 45 Figure 46 Step 40 Install small post and single lower rail completing porch assembly Glue top of post to 3rd floor ...

Page 22: ...Figure 47 Step 42 Install main roof shingles Figure 48 Figure 48 Figure 49 Step 43 Alcove roof shingles start at bottom and work way up gluing shingles to align to the mark on the center front of each shingle and the roof shingles Figure 49 ...

Page 23: ...igure 50 again following main roof shingles and mid line on prior installed shingle Continue to top Last shingle aligns to lower shingle Figure 50 Step 45 Do the same process for the remaining three front panels Figure 51 Figure 51 ...

Page 24: ...Step 46 Stain roof shingles and Install alcove roof running trim figure 52 The house is now completed Figure 52 ...

Page 25: ...Laser Dollhouse Designs www laserdollhouses com laserdollhouses aol com ...