background image

ver.0118-1 

SPLT-1.59K-800A-30-4X100W-LED-MS

Larson Electronics LLC 

The job box, located on the front of the 
trailer contains all of the electrical 
controls. This can be locked via padlocks 
to prevent unauthorized access. 

1.

Open the job box and locate the (3) three main disconnect switches
on the back panel. Switch these all to their ON position. Once these
are ON, the solar system is activated and will begin charging the
batteries.

A. 

Turn the 

CHARGE CONTROLLER ON

B. 

Turn the 

SOLAR BREAKER ON

C. 

Turn the black and yellow 

DISCONNECT

 

ON

The unit is now ready for charging. This unit is built to protect itself in order 
to prolong battery life. The unit will not come on until voltage has reached 

24.7V

The unit will shut off at 24V

Once the unit reaches the correct voltage of 24.7V, the mast can be 
extended. 

1.

Before extending the mast, ensure the
ball valve is in the 

UP

 position. If not,

the pump will immediately shut off once
powered on.

2.

To extend the mast, simply turn 

ON

 the

PUMP

 switch located next to the power

switch on the right hand side.

3.

Once the mast reaches 

30 PSI

,

 

the pump will

automatically shut off. The pump may cycle
multiple times to reach this PSI, depending on
the environment.

4.

Once the pump shuts off, the lights are ready to be powered on.
Switch the 

POWER

 switch on the right 

ON

 to enable power to the

inverter.

5.

To turn the lights on, simply switch the

(2)

 light switches located on the left.

There are two lighting options available; 

STEADY & MOTION

Steady

, powers the lights as normal with their respective power 

switches. 

Motion

, powers the lights as motion is detected near the 

mast. See 

MOTION SENSOR OPERATION

 for settings. 

NOTE: 

Leaving the lights on during charge will greatly diminish run 

time of the lights. 

The unit is now deployed! 

POWERING THE UNIT 

EXTENDING MAST 

A. 

B. 

C. 

Reviews: