background image

ver.0118-1 

SPLT-1.59K-800A-30-4X100W-LED-MS

Larson Electronics LLC 

Solar Power Generator with Pneumatic Light Tower Mast 

Part# 

SPLT-1.59K-800A-30-4X100W-LED-MS

 

READ BEFORE OPERATING OR DEPLOYING! 

Read these instructions carefully 

BEFORE

 attempting to operate or deploy 

the solar powered trailer. Failure to comply with instructions and guidelines 
could result in serious or fatal injury, as well as void any warranty. Retain 
these instructions for future reference. 

1.

Choose a location that is close to level as possible to position the
trailer. When picking a location, ensure the mast is free and clear from
any overhead obstructions.

Drop the trailer from the tow vehicle using the single jack located on 
the front of the trailer. Ensure the safety chains and cable have been 
disconnected from the tow vehicle. 

2.

Once the trailer has been disconnected from the
hitch of the tow vehicle, extend the remaining jacks.
There are 

(2) 

leveling jacks located on the 

back

and 

(2)

 jacks located on the 

front

 of the trailer. Pull

the pin on the side of the jack to rotate it 90° toward
the ground and hand crank the jack clockwise to
extend it.

Use a bubble level to ensure the trailer is level.
Ensure that the unit is

 completely level

 before

deploying!

The jacks can be extended outward by
loosening the hand screw, pulling the
jack/outrigger out and tightening hand screw.

3.

There are support plates holding each solar
panel in place for transport. 

Be sure to

disconnect these support plates prior to
deploying each solar panel array! 

Pull the support plate up and

push the solar panel out to free it. Repeat this process for the other
solar panel.

4.

You are now ready to deploy the solar panels.

OPERATION MANUAL 

DEPLOYING TRAILER 

FRONT HITCH JACK 

LEVELING JACK 

SUPPORT PLATE 

HAND SCREW 

Reviews: