background image

 

 
 

 

Page 2 of 4 

SPG530-500AH-24V-TLR10 SERIES OPERATION MANUAL

 

DEPLOYING THE UNIT 
1. 

Choose  a  location  that  is  close  to  level  as  possible  to  position  the  trailer.  Drop  the  trailer 
from  the  tow  vehicle  using  the  single  hand  jack  located  on  the  front  of  the  trailer.    Ensure 
that  the  safety  chains,  trailer  cable,  and  breakaway  lanyard  have  been  disconnected  from 
the tow vehicle. 
 

2. 

Once the trailer has been disconnected from the hitch of the tow 
vehicle, extend the remaining jacks. There are (2) leveling jacks 
located  on  the  back  and  (2)  jacks  located  on  the  front  of  the 
trailer. Pull the pin on the side of the jack to rotate it 90

° 

toward 

the  ground  and  hand  crank  the  jack  clockwise  to  extend  it. 

Models  with  light  mast,  use  a  bubble  level  to  ensure  the 
mast is level before extending!

 

 

3. 

To position the solar panels 45°, there is a pin located on each 
side of the solar panel. Remove each pin to free the panel 
assembly and pivot the solar panels down against the frame at a 
45° angle. Insert each pin to secure the panels in the new 

position.

 

 

 

4. 

Unlatch the solar panel and reposition it 45°. There is a hand 
screw located on each side of the solar panel. With help, remove 
each hand screw to free the panels and pivot the solar panels 
down against the frame at a 45° angle. Insert each hand screw 
to secure the panels. 

 

5. 

Open the job box located on back of trailer. If included with a 
padlock, locate the keys to both padlocks if it is locked. The job 
box will open once unlocked and there is no need to remove the 
padlocks. 

 
 

6. 

See Solar Controls section. Move the power switch to its 

ON

 

position to power the internals. Make sure all breakers and 
switches are moved to the 

ON

 position at this time. This will 

enable power to your attached devices and allow the solar 
panels to begin charging the batteries. A built in cooling system 
will circulate air when the job box exceeds 90° F (32° C) to help 
keep the internals cool. 

 

Reviews: