Page 4 of 4
PREPARING FOR TRANSPORT
1.
Power off all equipment. Open the job box and position the
main power switch
OFF
. If you wish to turn off the solar
controller and charger during extended periods of storage time.
Switch the main disconnect and breakers off.
2.
Lock the job box and take the keys to prevent unauthorized
access.
3.
Slide the outer solar panels back inwards and latch in place.
Position the solar panels horizontal and secure them with the
two hand screws.
4.
Lift the (4) jacks on each corner of the trailer by rotating the
hand crank counter-clockwise. Pull the pin and rotate each jack
90°.
5.
When the unit is powered off, and the (4) main jacks are raised, you are ready to attach a
tow vehicle. Once tied to a tow vehicle, raise the tow jack and ensure all other outriggers are
raised. Ensure the trailer hookup, breakaway cable, and safety chains are connected. Test
the trailer lights to ensure stop/tail/brake lights work before operating on public roadways.