POWER SWITCH 

BREAKERS 

SOLAR CONTROLS 

The  job  box  consists  of  all  the  solar  controls  and  electronics. 
The following switches should be turned ON for proper function. 

Yellow Breaker ON

 

– Solar Controller cutoff switch. Enables battery charging.

Black Toggle Switch ON

 

and Breakers ON

 

– Enables power to all electronics separate from

the solar controller and solar panels.

ENABLING SOLAR CHARGING

 

Turn all switches ON to enable the solar charger 
and power supply. 

1.

Breaker ON

2.

Power Switch ON

Once  these  switches  are  turned  ON,  the 
controller display will turn on indicating the unit is 
active.  Clean  and  adjust  the  solar  panels 
towards  the  sun  to  receive  the  best  possible 
charge throughout the day. 

Turn on the Power Switch 

Make sure the inverter is switched ON. 

The  main  power  switch  controls  everything 
connected to the terminal blocks.  

THERMOSTAT 

Adjusted from factory to keep the unit cool in warm temperatures. The thermostat will automatically 
enable a fan when temperatures exceed the set point and turn off once cooled. 

REMOVING THE HITCH 

The trailer hitch can be removed preventing the trailer from unauthorized towing. Remove the two 
bolts 

 

&

 

 

from the graphic below

 

holding it in place and lift the hitch off. This can be stored 

inside the job box when not in use. To install the hitch, place it back on the trailer tongue and replace 
the two bolts. Be sure both safety chains are attached. 

80A BREAKER 

Summary of Contents for SPG530-500AH-24V-4X120V-TLR10

Page 1: ...1 of 4 OPERATION MANUAL Portable Solar Power Generator SPG530 500AH 24V 4X120V TLR10 TABLE OF CONTENTS DEPLOYING THE UNIT Page 2 SOLAR CONTROLS Page 3 REMOVING THE HITCH Page 3 PREPARING FOR TRANSPORT Page 4 ...

Page 2: ...de of the solar panel Remove each pin to free the panel assembly and pivot the solar panels down against the frame at a 45 angle Insert each pin to secure the panels in the new position 4 Unlatch the solar panel and reposition it 45 There is a hand screw located on each side of the solar panel With help remove each hand screw to free the panels and pivot the solar panels down against the frame at ...

Page 3: ... and adjust the solar panels towards the sun to receive the best possible charge throughout the day Turn on the Power Switch Make sure the inverter is switched ON The main power switch controls everything connected to the terminal blocks THERMOSTAT Adjusted from factory to keep the unit cool in warm temperatures The thermostat will automatically enable a fan when temperatures exceed the set point ...

Page 4: ...h in place Position the solar panels horizontal and secure them with the two hand screws 4 Lift the 4 jacks on each corner of the trailer by rotating the hand crank counter clockwise Pull the pin and rotate each jack 90 5 When the unit is powered off and the 4 main jacks are raised you are ready to attach a tow vehicle Once tied to a tow vehicle raise the tow jack and ensure all other outriggers a...

Reviews: