background image

SPG366A-600 Series 

Larson Electronics, LLC

 

  Phone: (800) 369-6671 

 Fax: (903) 498-3364 

  www.larsonelectronics.com 

4 of 6

1.) 

Unlock the compartment door at the 

front

 of the 

trailer to access the internal controls.

2.) 

Turn 

the  battery  disconnect  switch  (C)  to  the 

on  position

.

  Flip  the  black  and  yellow  solar  charger 

breaker  (A)  and  the  black  solar  panel  breaker  (B)  to 

the on positions. 

3.)

 

DO NOT RAISE MAST YET. 

 

When you turn on 

the system, the remote meter will display 

"SEARCHING...", DO NOT raise the mast until this is no 

longer displayed.

4.) 

When the system is ready, you can now raise the 

mast. To raise, flip the air compressor switch to 

COMPRESSOR ON and the mast switch to MAST UP 

and allow the mast to fully elevate. 

NOTE: The T-Head 

mast supports up to 120 lbs. DO NOT overload.

5.) 

Once the mast is full, the air compressor will 

automatically shut off. This typically

 

takes 30 seconds to 

1 minute after the mast has fully extended. Keeping the 
air

 

compressor switched on will keep the mast elevated 

during long term deployment.

Reviews: