![Larius New Excalibur Operating And Maintenance Instruction Manual Download Page 35](http://html1.mh-extra.com/html/larius/new-excalibur/new-excalibur_operating-and-maintenance-instruction-manual_676418035.webp)
Ed. 015 - 02/2019
www.larius.eu
NEW EXCALIBUR
31
P39
AppLY
pTFE
repLACeMeNT OF THe BALL reLeAse GrOUp seAL
In case there is a loss of material from the ball release group
(
p39
), it is necessary to replace the gasket (
X1
) as shown.
X1
P40
•
For correct reassembly, see the exploded diagram for the
pump unit, and invert the order used for disassembly.
•
Once the unit has been positioned correctly, tighten the
lock nut (
p37
) hard against the front template.
To tighten, use a 45 mm spanner.
•
Close the inspection cover (
p2
) again.
•
Fit the suction pipe (
p8
).
Put PTFE tape or liquid PTFE over the threaded part (
p39
)
before screwing it onto the foot valve..
P37
P2