
Sub-GHz LSI Evaluation Kit Start Guide
FEXL_SubGHz_EVA_startguide-02
2
2.1.
Control Board Setting
This section describes the control board setting.
Figure 1: Control Board Overview
Table 1:
Detailed Description of Control Board
No.
Symbol
Name
Function
Initial
configuration
1
JP1
Main power supply setup
USB electric supply (1-2) and external electric
supply (2-3)
1-2
2
JP2
External electric supply setup to JP1
Power supply terminal J1 (1-2) and for uEASE
(2-3)
1-2
3
JP3
Evaluation board power supply setup
A main power supply (1-2) and the power supply
terminal J1 (2-3) *1
1-2
4
JP4
RESET setup
uEASE (1-2) and RESET SW (2-3)
2-3
5
JP5
(V-RF)
Evaluation board power supply
The consumption current of an evaluation board is
measured.
short
6
JP6
DIO signal connection
Connects DIO and MCU(short) *2
open
7
JP7
DCLK signal connection
Connects DCLK and MCU (short) *2
open
8
JP8
No use
Open *3
no jumper
9
SW
SW
General SW (future extension)
10
RESET
RESET
Hard reset button
11
J1
Power supply terminal
Power supply connector
*1. *(2-3) is used when a test the voltage characteristic of an evaluation board.
*2. uses in DIO mode
(
future extension
)
*3. It may break, when it is made to Short with products.
1
9
2
3
4
7 SEG LED
5
7
6
8
11
10