17
Pin assignment of alarm relay
A break in contact is reported via the relay contact :
The failure of at least one of the two supply voltages.
The break link status of at least one switch port.
3.1.4 Fitting the device, grounding
Install the system in a dry and clean area to protect the switch to
get exposed with dirt.
Plug the connector to the power supply plug then turn on the power
supply.
Ground
– IP67 model
The chassis is grounded via a separate ground nut (M3).
Use toothed locking washers for a good electrical connection.
Summary of Contents for IES-5416T Series
Page 8: ...7 2 2 Front Panel PoE model ...
Page 9: ...8 Non PoE model 2 3 Package Content Ethernet switch Console cable Manual CD by request ...
Page 20: ...19 Pin assignment of M12 10 100Tx network connector ...
Page 22: ...21 protection Empty ports must be sealed with the protective caps supplied ...