
43
Installing the System into the Rack
1.
Stretch both of the Inner Channels
out to their fullest extent. You will
hear a click sound when they are
fully stretched and stop.
2.
Hold the system with its front
facing you, lift the chassis and
gently engage the Rail Brackets on
the model while aligning them with
the slide-rail assemblies as shown
in the image, and then push the
system into the cabinet.
While pushing in the system, please
also push and hold the Rail Lock
tab on both Rail Brackets.
Click
The inner rail will click
when it is fully stretched.
Rail Lock
Summary of Contents for NCA-5520
Page 16: ...16...
Page 44: ...44 3 Fix the lock screws on the Ear Brackets to both front posts...
Page 63: ...63 Super IO Configuration...
Page 79: ...79 NVMe Configuration Network Stack Configuration...
Page 86: ...86 Server ME Configuration...
Page 89: ...89 Processor Configuration...
Page 91: ...91 Per Socket Configuration Feature Options Description CPU Socket0 Configuration None None...
Page 106: ...106 View System Event Log...