![Lanner HCP-72i1 User Manual Download Page 33](http://html1.mh-extra.com/html/lanner/hcp-72i1/hcp-72i1_user-manual_3605828033.webp)
33
www.lannerinc.com
3. Turn the slide rail upside down and push the black
arrow-shaped slide rail lock as the arrow of direction
below.
4. Press the security lock of the rail as well.
5. Separate the inner bracket from the slide rail.
6. Align the inner bracket to the side of the chassis.
Make sure the screw holes of the inner bracket match
with the ones on the side of the chassis.
7. Securely attach the inner bracket to the side of the
chassis by applying screws.
8. Repeat step 1 to 7 for another slide rail and for the
other side of the chassis.
Rack Mounting
Installation Precautions:
Elevated Operating Ambient - If installed in a closed
1.
or multi-unit rack assembly, the operating ambient
temperature of the rack environment may be greater
than room ambient. Therefore, consideration should be
given to installing the equipment in an environment
compatible with the maximum ambient temperature
(Tma) specified by the manufacturer.
Reduced Air Flow - Installation of the equipment in
2.
a rack should be such that the amount of air flow
required for safe operation of the equipment is not
compromised. Mechanical Loading - Mounting of the
equipment in the rack should be such that a hazardous
condition is not created due to uneven mechanical
loading.
Circuit Overloading - Consideration should be given to
3.
the connection of the equipment to the supply circuit
and the effect that overloading of the circuits might
have on over-current protection and supply wiring.
Appropriate consideration of equipment nameplate
ratings should be used when addressing this concern.
Reliable Earthing - Reliable earthing of rack-mounted
4.
equipment should be maintained. Particular attention
should be given to supply connections other than
direct connections to the branch circuit (e.g. use of
power strips).”
CAUTION :
Slide/rail mounted equipment is not to be used as a
shelf or a work space.
Prepare The Equipments
1. Prepare the slide rail equipments. In the package, you
should have two slide rails and 1 bag of screws.
2. Extend the inner bracket of each slide rail.
Summary of Contents for HCP-72i1
Page 9: ...9 www lannerinc com Chapter 1 Introduction...
Page 14: ...14 www lannerinc com Chapter 2 System Components...
Page 15: ...15 www lannerinc com Chapter 2 System Components Mechanical Drawings Unit mm...
Page 18: ...18 www lannerinc com Chapter 3 Motherboard Information...
Page 26: ...26 www lannerinc com Chapter 4 Hardware Installation...
Page 35: ...35 www lannerinc com Chapter 5 BIOS Setup...
Page 74: ...74 www lannerinc com NETWORK Device BBS Priorities 1st Boot set boot priority...
Page 77: ...77 www lannerinc com Chapter 6 IPMI Navigation...
Page 97: ...97 www lannerinc com Chapter 7 About the PCIe Switch Feature of HCP 72i1...
Page 116: ...116 www lannerinc com...