2
INSTALLATION
RECEIVING THE MODEL SR-18 STOCK POT RANGE
Upon receipt, check for freight damage, both visible and concealed. Visible damage should be
noted on the freight bill at the time of delivery and signed by the carrier's agent. Concealed loss
or damage means loss or damage which does not become apparent until the merchandise has
been unpacked. If concealed loss or damage is discovered upon unpacking, make a written
request for inspection by the carrier's agent within 15 days of delivery. All packing material
should be kept for inspection. Do not return damaged merchandise to Lang Manufacturing
Company. File your claim with the carrier.
Uncrate your Stock Pot Range as near its intended location as practical. The crating will help
protect the unit from the physical damage normally associated with moving it through hallways
and doorways.
VENTILATION AND CLEARANCES
The installation of any components such as vent hoods, grease extractors, or fire extinguisher
systems, must conform to their applicable nationally recognized installation standards.
Caution
Caution
Caution
Caution
Minimum clearance from combustible construction shall be:
3 inches from side walls
3 inches from back wall
DATA PLATE INFORMATION