5
UNPACKING
3.1 Receiving the Griddle
Upon receipt, check for freight damage, both visible and concealed. Visible
damage should be noted on the freight bill at the time of delivery and signed by the
carrier's agent. Concealed loss or damage means loss or damage which does not
become apparent until the merchandise has been unpacked. If concealed loss or
damage is discovered upon unpacking, make a written request for inspection by the
carrier's agent within 15 days of delivery. All packing material should be kept for
inspection. Do not return damaged merchandise to Lang Manufacturing Company.
File your claim with the carrier.
3.2 Location
Prior to un-crating, move the griddle as near its intended location as practical. The
crating will help protect the unit from the physical damage normally associated
with moving it through hallways and doorways.
3.3 Un-crating
The griddle will arrive completely assembled inside a wood frame covered by
cardboard box and strapped to a skid.
Remove the cardboard cover, cut the
straps and remove the wood frame.
Remove griddle from skid and place in intended location.
CAUTION
GRIDDLE WEIGHS 515 lbs (234 kg). FOR SAFE HANDLING, INSTALLER
SHOULD OBTAIN HELP AS NEEDED, OR EMPLOY APPROPRIATE
MATERIALS HANDLING EQUIPMENT (SUCH AS A FORKLIFT, DOLLY, OR
PALLET JACK) TO REMOVE THE UNIT FROM THE SKID AND MOVE IT TO
THE PLACE OF INSTALLATION.
CAUTION
ANY STAND, COUNTER OR OTHER DEVICE ON WHICH GRIDDLE WILL BE
LOCATED MUST BE DESIGNED TO SUPPORT THE WEIGHT OF THE
GRIDDLE.
CAUTION
SHIPPING STRAPS ARE UNDER TENSION AND CAN SNAP BACK WHEN
CUT.
Summary of Contents for CLGPB-48A-E
Page 12: ...12 EXPLODED VIEW ...
Page 13: ...13 EXPLODED VIEW CONT D ...
Page 14: ...14 EXPLODED VIEW CONT D 20 21 18 19 ...
Page 15: ...15 WIRING DIAGRAM ...