background image

 

11

 

PARTS LIST 

 

CLB-1L-L 

Item # 

Description 

Part Number Qty 

1 Body 

N/A 

2 Pan 

CLB-226 

High Temperature Gasket Material 

72602-04

 

44 

Broiler Switch Panel 

CLB-225 

Knob comes with the 2 Heat switch 25 amp 

30304-32

 

6 Rack 

Adjustment 

CLB-319 

Screw Stainless Steel 10-32 x 1/2 Hex Head 

20111-09

 

46 

8 Front 

Hood 

CLB-212 

1 3/8” Snap Bushing 

70801-02

 

10 

Terminal Block Mount 

CLB-224 

11 

Broiler Heat Shield 

CLB-218 

12 Can 

Assembly 

CLB-001 

13 Element 

Holder 

CLB-309 

14 Element 

11100-13 

15 

Element Heat Shield 

CLB-427 

16 

Large 2 Pole Terminal Block 

30500-11

 

17 

Nut Hex Stainless Steel 10-24 

20303-08

 

32 

18 

Washer Stainless Steel 5/16 S.A.E. Flat 

20203-06

 

32 

19 

Screw Stainless Steel 1/4-20 x 1 1/4” Hex Head 

20111-25

 

20 Bearing 

Washer 

CLB-310 

21 Broiler 

Bearing 

70202-03 

22 Bearing 

Bracket 

CLB-401

 

23 

Nut Hex Acorn 1/4-20 Stainless Steel 

20301-29

 

24 Carriage 

Assembly 

CLB-002 

25 

Heat Shield with Clips 

CLB-420 

26 

Heat Shield #2 

CLB-425 

27 Rack 

50200-80

 

28 Rear 

Firewall 

CLB-219 

29 

Can Wire Support 

CLB-320 

30 Main 

Stack 

CLB-330 

31 Back 

CLB-209 

32 Vent 

Trim 

CLB-211 

33 

Panel Vent Stack 

CLB-244 

34 

Panel Vent Top 

CLB-243 

35 Wire 

Harness 

CLB-501 

36 

2 Heat Switch – 25 Amp 

30304-32

 

 

Summary of Contents for CLB-1L-L

Page 1: ...00 Merrill Creek Parkway Everett WA 98203 Phone 425 349 2400 Fax 425 349 2733 WWW LANGWORLD COM Copyright 2000 Installation Operation Maintenance Troubleshooting Model CLB 1L L Electric Cruise Line Si...

Page 2: ...NING IMPROPER INSTALLATION ADJUSTMENT ALTERATION SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE INJURY OR DEATH READ THE INSTALLATION OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALL...

Page 3: ...TENTS CHAPTER PAGE 1 TABLE OF CONTENTS 3 2 READ FIRST 4 3 UNPACKING 6 4 INSTALLATION 7 5 INITIAL START UP 8 6 OPERATION 8 7 CLEANING 9 8 TROUBLESHOOTING 10 9 PARTS LISTS 11 10 EXPLODED VIEW 12 11 WIRI...

Page 4: ...DONE BY PERSONNEL QUALIFIED TO WORK WITH ELECTRICITY IMPROPER INSTALLATION CAN CAUSE INJURY TO PERSONNEL AND OR DAMAGE TO EQUIPMENT UNIT MUST BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE CODES NOTIC...

Page 5: ...this or any other LANG appliance must be performed by qualified personnel only Consult your authorized service station directory or call the factory at 1 800 224 LANG 5264 or WWW LANGWORLD COM for th...

Page 6: ...carefully Improper use of tools can result in damage to the equipment Remove and discard plastic wrap Remove and discard desiccant bags placed inside broiler cavity The broiler rack frame and rack are...

Page 7: ...ion should be carefully read and understood before proceeding with the installation NOTICE The installation of any components such as a vent hood grease extractors fire extinguisher systems must confo...

Page 8: ...r the first couple of hours of use this is normal OPERATION CAUTION ALWAYS KEEP THE AREA NEAR THE APPLIANCE FREE FROM COMBUSTIBLE MATERIALS CAUTION KEEP FLOOR IN FRONT OF EQUIPMENT CLEAN AND DRY IF SP...

Page 9: ...OTECTIVE CLOTHING CAREFULLY READ THE WARNING AND FOLLOW THE DIRECTIONS ON THE LABEL OF THE CLEANER TO BE USED Empty crumb tray daily or when 1 3 full It is easily removed for washing Clean exterior of...

Page 10: ...ectory or call the factory at 1 800 224 LANG 5264 or WWW LANGWORLD COM for the service station nearest you WARNING BOTH HIGH AND LOW VOLTAGES ARE PRESENT INSIDE THIS APPLIANCE WHEN THE UNIT IS PLUGGED...

Page 11: ...eat Shield CLB 427 2 16 Large 2 Pole Terminal Block 30500 11 2 17 Nut Hex Stainless Steel 10 24 20303 08 32 18 Washer Stainless Steel 5 16 S A E Flat 20203 06 32 19 Screw Stainless Steel 1 4 20 x 1 1...

Page 12: ...12...

Page 13: ...13...

Page 14: ...14...

Page 15: ...15...

Page 16: ...16 WIRING DIAGRAM...

Reviews: