Landis+Gyr E6V Installation Manual Download Page 5

 

 

Issue:1 

5/10 

G130 Installation and Commissioning  

                      July 2012 ver 01 

© 2012 Gyr Ltd 

 

Safety 

2.1 

Safety Information 

Attention is drawn as follows in the individual chapters of this user manual with classified 
word symbols and pictographs to the relevant danger level, i.e. the severity and 
probability of any danger:  

Definition of danger 

This symbol is used to indicate a possible dangerous situation which could result in 
severe physical injury or death. 

 

Definition of warning 

This symbol is used to indicate a possible dangerous situation which could result in 
minor physical injury or material damage. 

 

Definition of Note 

This symbol is used to indicate general details and other useful information. 

 

2.2 

Responsibilities

 

The owner of the meter is responsible that all people engaged on work with the meter:- 
  

  have read and understood the relevant sections of this user manual.  

  are sufficiently qualified  

  strictly observe the safety regulations and the operating information in the individual 

chapters. In particular, the owner of the meter bears responsibility for the training of 
personnel. 

2.3 

Safety Regulations 

The following safety regulations must be observed at all times:  

  This equipment does not contain an Emergency Control Valve. Means for 

  shutting off the supply must be provided as part of the building installation.  

  Only suitably trained and qualified personnel shall be allowed to work on the 

  equipment. Local safety standards shall be observed and shall take precedence 
  over these regulations in points of conflict.  

  The meter must be held securely during installation. They can cause injuries if 

  dropped.  

  Any meter that has fallen must not be installed, even if no damage is apparent, 

  but must be returned for testing to the service and repair department responsible 
  (or the manufacturer). 

  The meter must on no account be cleaned with running water or with high-

  pressure devices. Water penetration can cause short-circuits.  

Summary of Contents for E6V

Page 1: ...L G Confidential G130 Installation and Commissioning Manual July 2012 ver 01 2012 Landis Gyr Ltd Advanced Metering Infrastructure L G Electronic Smart Ready Gasmeter G130 Installation Manual ...

Page 2: ...d Revision history Issue Date Comments 1 July 2012 First revision of G130 Installation and Commissioning Manual Subject to change without notice Landis Gyr 1 Lysander Drive Northfields Industrial Estate Market Deeping Peterborough PE68FB www Landisgyr com Tel 44 1778 349700 Fax 44 1778 349701 ...

Page 3: ..._________________________5 3 Installation Procedure ___________________________________________________ 6 4 The Service Menu_______________________________________________________ 8 4 1 The Service Menu sequence _________________________________________________8 4 2 Accessing the Service Menu _________________________________________________8 5 Installation_______________________________________ E...

Page 4: ...e applies to the G130 Smart Ready Gas meter E6 residential gas meter 1 2 Purpose This manual contains information required to install and commission the G130 Smart meter 1 3 Target Group The contents of this user manual are intended for technically qualified personnel of energy supply companies responsible for system planning installation and commissioning operation maintenance decommissioning and...

Page 5: ...is user manual are sufficiently qualified strictly observe the safety regulations and the operating information in the individual chapters In particular the owner of the meter bears responsibility for the training of personnel 2 3 Safety Regulations The following safety regulations must be observed at all times This equipment does not contain an Emergency Control Valve Means for shutting off the s...

Page 6: ...r requires no maintenance by the end user The external surfaces may be cleaned if required using a damp or anti static cloth 3 2 The safe removal of the existing meter 1 Isolate the gas supply via the Emergency control valve or other locally defined methodology 2 Record any necessary details such as outgoing meter serial number and the outgoing meter volume index 3 Store outgoing meter for return ...

Page 7: ...uld be followed G130 Valve Status displays 3 5 Display cycle The full display cycle is shown in the diagram below Press A or B to wake the display The index display is then shown Pressing button A will then show the valve status display Another press of button A or a timeout will return to the default display Holding button A whilst in the default display will enter the Rolling Register display se...

Page 8: ...characters are entered pressing button A until the desired character is shown in that position Pressing button B will move to the next character on the right It is possible to roll around back to the beginning if necessary to correct errors Holding button B for more than 3 seconds causes the meter to check the PIN code against the entered one If the PIN code is correct access to the menus is grant...

Page 9: ...Issue 1 9 10 G130 Installation and Commissioning July 2012 ver 01 2012 Landis Gyr Ltd 5 Rolling Register Displays The G130 has a single rolling register which displays the module firmware version ...

Page 10: ...ible to initiate a valve open process as follows Press button B Release button B Confirm Appliances are off by pressing button A Hold button A until display changes to next Release button A Wait for valve to open 30 seconds Default display Valve Open If the High Flow Open Interlock option is active and causes the valve to reclose then the Press B for Gas display will become available again Repeat ...