![background image](http://html1.mh-extra.com/html/landice/l-series/l-series_diagnostic-and-service-manual_3541440075.webp)
75
ELEVATION LEG ASSEMBLY
1. Remove motor cover screws (4 screws) and remove motor cover.
2. Remove set screws (2) holding elevation motor to elevation leg assembly.
3. Remove elevation pins from elevation gear nut.
4. Carefully turn treadmill onto its side to gain access to elevation leg mounting brackets.
5. Remove screws from mounting brackets (2 on each side) and remove leg assembly. Note: On
re-assembly be sure to lubricate brackets with Lubriplate.
6. Reverse to install.
TREADBELT AND DECK REMOVAL/DECK REVERSAL
L7
1. Remove Traction Strip from frame rail by lifting from end. Strip just snaps into place on grooves
of frame rail.
2. Unscrew Take up Roller end caps.
3. Loosen Take up Roller adjustment bolts till belt is loose. Do both sides equally. Note: See
section on
Tracking and Tensioning
4. Remove frame rail cap from left & right sides (7 screws). Note: Felt washers under machined
screws (3). You may need to use rubber mallet to loosen rail.
5. Remove Drive Belt from Drive Roller by loosening tension screw on Drive Motor Bracket.
6. Remove Drive Roller by loosening mounting bolts on left and right side.
7. Lift Deck off of VFX mounting posts.
8. Reverse to install. Note: Be sure to lubricate the VFX post with Lubriplate when re-installing
Deck.
L8
1. Unscrew Take Up Roller End Caps (2 Philips Head Screws)
2. Loosen take up roller adjustment bolts (9/16) till treadbelt is loose. Do both sides equally. Note:
See section on
Tracking and Tensioning
3. Remove frame rail cap from left side (4 Philips Screws) and rear (2 Philips Screws). You may
need to use a rubber mallet to loosen rail.
4. Lift Deck off of VFX mounting posts.
5. Reverse to install. Note: Be sure to lubricate the VFX post with Lubriplate when re-installing
Deck.
Take Up Roller/ Rear Roller
L7
1. Remove Traction Strip from left side Frame Rail Cap. Traction Strip just snaps into place on
grooves in Frame Rail Cap.
2. Remove Frame Rail Cap (7 screws). Note: Felt washers under (3) machined screws.
3. Remove End Caps (2 Screws)
4. Remove Roller bolts (2 Bolts). Note: See section on
Tracking and Tensioning
5. Remove Metal Finger Guard (2 Screws)
6. Remove Roller.
7. Reverse to install
Summary of Contents for L Series
Page 5: ...5...
Page 27: ...27 Section 3 Parts Identification L8 L9 BED EXPLODED VIEW 18...
Page 28: ...28 L7 BED EXPLODED VIEW L Series Upright...
Page 29: ...29 L SERIES UPRIGHT EXPLODED VIEW 112...
Page 30: ...30 L SERIES MOTOR PAN EXPLODED VIEW 111...
Page 35: ...35 COMMERCIAL MOTOR PAN SCR MOTOR CONTROL BOARD...
Page 36: ...36 L SERIES 110V COMMERCIAL LOWER WIRE SCHEMATIC...
Page 37: ...37 L SERIES 220V COMMERCIAL LOWER WIRE SCHEMATIC...
Page 40: ...40 L SERIES SCR UPPER WIRE HARNESS WIRING DIAGRAM...
Page 42: ...42 L SERIES HOME MOTOR PAN WIRING SCHEMATIC...
Page 47: ...47 L SERIES HOME MOTOR PAN WIRING SCHEMATIC PWM MOTOR CONTROL BOARD W RELAY ASSEMBLY...
Page 48: ...48 PWM MOTOR CONTROL BOARD W RELAY ASSEMBLY...
Page 49: ...49 L SERIES PWM UPPER WIRE HARNESS WIRING DIAGRAM...
Page 50: ...50 EXECUTIVE TRAINER LCD WIRING SCHEMATIC...
Page 110: ...110 L SERIES ROAD RUNNER LOWER WIRING DIAGRAM...
Page 111: ...111 L SERIES ROAD RUNNER UPPER WIRING SCHEMATIC...