Section 1: Assembly & Set-up
WB10 & WB15 Weight Box 335-064M
6/1/22
12
Unhook WB15
Refer to Figure 1-3 on page 11:
DANGER
!
To avoid serious injury or death:
•
Always secure equipment with solid, non-concrete supports
before working under it. Never go under equipment
supported by concrete blocks or hydraulics. Concrete can
break, hydraulic lines can burst, and/or hydraulic controls
can be actuated even when power to hydraulics is off.
•
Park Weight Box on a solid, level surface that will not give
way when wet or for any other reason. Make sure the box is
stable and can not fall over.
on page 16 when parking
the Weight Box for long periods or at the end of the
season.
2. Park tractor with Weight Box on a flat, level, solid
surface.
3. Lower the box down until it is resting on the ground.
4. If unhooking from a Quick Hitch, follow instructions in
the Quick Hitch Operator’s Manual. Otherwise,
continue with step 5.
5. Shut tractor down according to
6. Remove hairpin cotter and clevis pin from top center
3-point link.
7.
Store top center 3-point link in tractor holder.
8. Reinstall clevis pin and hairpin cotter in the Weight
Box center clevis for safe keeping.
9. Remove linchpins (#2) from clevis pins (#1) and set
aside.
10. Remove clevis pins (#1) from lower 3-point arms and
set aside.
11. Return to the tractor and drive slowly away making
sure tractor and lower 3-point arms are clear while
pulling away.
12. Shut tractor down according to
13. Replace removed clevis pins (#1) in box and secure
with removed linchpins (#2) for safe keeping.
Level Weight Box
Figure 1-4
Level Weight Box
Refer to Figure 1-4:
1. Park the tractor on flat, level ground and lower the
box until it is slightly off the ground.
2. Without changing the 3-point lift height, shut tractor
3. Place a level on the back of the box as shown in
position (#1).
4. Adjust one of the lower 3-point arms up or down as
needed to level the box left to right.
5. Move the level to position (#2) and adjust the center
3-point link to level the box from front to back.
•
Shorten center link if the box is low at the back.
•
Lengthen center link if the box is high at the back.
Position #1
Position #2
74823
NOTE:
When leveling is complete, the Weight Box
should be parallel with the ground from front to back
and side to side. If leveling is done on a slightly
inclined surface, then use a tape measure to ensure
the top of the box is parallel with the ground.