Table of Contents
7/9/20
©
Copyright 2020 All rights Reserved
Land Pride provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been taken in the
preparation of this manual, Land Pride assumes no responsibility for errors or omissions. Neither is any liability assumed for damages resulting from the use
of the information contained herein. Land Pride reserves the right to revise and improve its products as it sees fit. This publication describes the state of this
product at the time of its publication, and may not reflect the product in the future.
Land Pride is a registered trademark.
All other brands and product names are trademarks or registered trademarks of their respective holders.
Printed in the United States of America.
RCB(M)5710 & RCB(M)L5710 Rotary Cutters 337-049M
iii
Table of Contents
Important Safety Information . . . . . . . . . . . . . 1
Safety at All Times . . . . . . . . . . . . . . . . . . . . . . . . . 1
Look For The Safety Alert Symbol . . . . . . . . . . . . . 1
Safety Labels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Serial Number . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Section 1: Assembly & Set-up . . . . . . . . . . . 14
Tractor Requirements . . . . . . . . . . . . . . . . . . . . . . 15
Drawbar Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Hydraulic Outlets . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Torque Requirements . . . . . . . . . . . . . . . . . . . . . . 16
Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Hitch Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Hitch Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Attach Park Jack . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Attach Spring Hose Loop . . . . . . . . . . . . . . . . . . . 19
Hook-up Constant Level Clevis Hitch . . . . . . . . . . 20
Hook-up LP Performance Hitch . . . . . . . . . . . . . . . 21
Hook-up Bar-Tite Hitch . . . . . . . . . . . . . . . . . . . . . 22
Hydraulic Plumbing . . . . . . . . . . . . . . . . . . . . . . . . 23
Fold Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Single Action Fold Assembly . . . . . . . . . . . . . . . 23
Dual Action Fold Assembly . . . . . . . . . . . . . . . . 24
Lift Rephasing Assembly . . . . . . . . . . . . . . . . . . 24
Rephasing Lift Cylinders & Plumbing . . . . . . . . 24
Hydraulic Hook-up . . . . . . . . . . . . . . . . . . . . . . . . 25
Unfold Wing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Fold Lock Lugs Set-up . . . . . . . . . . . . . . . . . . . . . 27
Driveline Assembly . . . . . . . . . . . . . . . . . . . . . . . . 28
Driveline Hook-up to Tractor . . . . . . . . . . . . . . . . . 29
Driveline Support Adjustment . . . . . . . . . . . . . . . . 30
Driveline Clearance Check . . . . . . . . . . . . . . . . . . 30
Purge Hydraulic System . . . . . . . . . . . . . . . . . . . . 31
Rephase Lift Cylinders . . . . . . . . . . . . . . . . . . . . . 32
Hook-up LED Lights . . . . . . . . . . . . . . . . . . . . . . . 32
Unhook Rotary Cutter . . . . . . . . . . . . . . . . . . . . . . 33
Relocate SMV Sign . . . . . . . . . . . . . . . . . . . . . . 34
Section 2: Adjustments . . . . . . . . . . . . . . . . . 35
LP Performance Hitch Hole Size . . . . . . . . . . . . . . 35
Park Jack Angle Alignment . . . . . . . . . . . . . . . . . . 35
Lift Cylinder Base Mount . . . . . . . . . . . . . . . . . . . . 36
Level Center & Wing Deck . . . . . . . . . . . . . . . . . . 37
Adjust Cutter Height . . . . . . . . . . . . . . . . . . . . . . . 38
Section 3: Operating . . . . . . . . . . . . . . . . . . . . 39
Operator’s Responsibilities . . . . . . . . . . . . . . . . . . 39
Safety Information . . . . . . . . . . . . . . . . . . . . . . . . . 39
Tractor Shutdown Procedure . . . . . . . . . . . . . . . . . 40
Tractor & Cutter Inspection . . . . . . . . . . . . . . . . . . 41
Avoid Extreme Turning Angles . . . . . . . . . . . . . . . 41
Blade Operation Inspection . . . . . . . . . . . . . . . . . . 41
Transport Lock . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Transporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Roadside Cutting . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Field Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Field Inspections . . . . . . . . . . . . . . . . . . . . . . . . 43
Unfold Wing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Set Blade Cutting Height . . . . . . . . . . . . . . . . . . 44
Set Wing Lift Lever to Float Position . . . . . . . . . 44
Rephasing Lift Cylinders . . . . . . . . . . . . . . . . . . 44
Select Gear Range . . . . . . . . . . . . . . . . . . . . . . . 44
Engage Blades . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Disengage Blades . . . . . . . . . . . . . . . . . . . . . . . . . 44
Remove Blade Carrier Blockage . . . . . . . . . . . . . . 45
General Operating Instructions . . . . . . . . . . . . . . . 46