Tel:
Internet:
1800 28 44 46
www.carecompany.com.au
Page 4/7
Manual
–
ARZ Decontamination showers
©2021
Version 02
3.2.2 Using the Electrical Blower
a) Prepare electrical blower according to the manual of the electrical
blower.
b) Connect the hose of the electrical blower to the main valve and lock
connector to the tent valve and switch on the blower to fill the tubes.
a) The maximum pressure of the electrical blower of 0.3 bar is less than
the opening pressure of the relief valve. This is why the relief valve
usually doesn’t open.
b)
Using the electrical blower longer than needed for the inflation
process may cause overheating.
Do not use continually for more than 5 minutes to avoid overheating!
3.3 Final Work to Do
a) Fix shower with T-pegs 30cm to the ground.
b) Fasten guy ropes with T-pegs 30cm and tighten them.
c) Connect the plastic base plates and put them into the shower cabin.
3.4 Important Information
a) Avoid punctual weight and sharp things on the groundsheet.
b) When there are first signs of low pressure of the tube system start to
refill the air in the tent.
c) Check guy ropes regularly and tighten again if needed.
d)
When you assume that a tube is leaky, lather the tube in order to
locate the leaky spot. Repair according to No. 5.
e) Snow loads have to be removed immediately.