3.2.2 Using the Electrical Blower 

 

a)  Prepare electrical blower according to the manual of the electrical 

blower. 

b)  Connect the hose of the electrical blower to the main valve and lock 

connector to the tent valve and switch on the blower to fill the tubes. 

a)  The maximum pressure of the electrical blower of 0.3 bar is less than 

the opening pressure of the relief valve. This is why the relief valve 
usually doesn’t open. 

b) 

Using the electrical blower longer than needed for the inflation 
process may cause overheating. 

 

Do not use continually for more than 5 minutes to avoid overheating! 

 
 
3.3 Final Work to Do 
 

a)  Fix shower with T-pegs 30cm to the ground. 
b)  Fasten guy ropes with T-pegs 30cm and tighten them. 
c)  Connect the plastic base plates and put them into the shower cabin. 

 
 
3.4 Important Information 

 

a)  Avoid punctual weight and sharp things on the groundsheet. 

 

b)  When there are first signs of low pressure of the tube system start to 

refill the air in the tent. 

 

c)  Check guy ropes regularly and tighten again if needed. 

 

d) 

When you assume that a tube is leaky, lather the tube in order to 
locate the leaky spot. Repair according to No. 5.

 

 

e)  Snow loads have to be removed immediately. 

 

Summary of Contents for care ARZ Decon

Page 1: ...ata 2 3 Set up Instructions 3 3 1 Unpacking and unfolding 3 3 2 Inflating 3 3 2 1 Using the hand Pump 3 3 2 2 Using the Electrical Blower 3 3 3 Final Work to do 4 3 4 Important Information 4 3 5 Pictu...

Page 2: ...cabin Electric fan Extra Hand shower Tub fixed to the shower 2x2m or 2x3m Reinforced windows 2 Technical Data Changes in the construction and fabric change weight and packing volume ARZ Decon 2x2m ARZ...

Page 3: ...ve is closed The valve inside must be even with the valve surface c Close opened valve by pushing down and turning the valve tappet clockwise d Fill the tube system with air Lifting the shower air tub...

Page 4: ...lectrical blower longer than needed for the inflation process may cause overheating Do not use continually for more than 5 minutes to avoid overheating 3 3 Final Work to Do a Fix shower with T pegs 30...

Page 5: ...Tel Internet 1800 28 44 46 www carecompany com au Page 5 7 Manual ARZ Decontamination showers 2021 Version 02 3 5 Pictures of Inflation Process Couplings Suction hose...

Page 6: ...s to open The air needs about 5 to 10 minutes to exhaust completely d Exhaust the air thoroughly with the hand pump or electrical blower 4 2 Folding and Packing a Spread out shower roof even and flat...

Page 7: ...valves the same way as above In case that a valve is not airtight anymore please follow step 5 4 5 3 Repairing of Holes and Fissures Repairing of holes and fissures at the shower frame groundsheet or...

Reviews: