background image

 

 

Tel: 
Internet: 

1800 28 44 46 
www.carecompany.com.au 
 

 
 
 
Page 7/7 

 

Manual 

 ARZ Decontamination showers 

 

©2021 

 

Version 02 

 

5. Care and Repair Instructions  

5.1 General Information  

 

Never pack the shower when it is wet or humid! 

– allow to dry 

completely before packing away.

 

 

5.2 Cleaning 

 

Only take common gentle cleaning soap.  

a)  Cleaning all textile parts with tepid, gentle soap-water and use a soft 

sponge. Always rinse with clear water completely and let it dry in the 
air. Please read and act according to cleaning advises for the fabric 
when you cannot remove dirt this way. 

b)  Clean dirty in- and deflation valves and relief valves the same way as 

above. In case that a valve is not airtight anymore, please follow step 
5.4. 

 

5.3 Repairing of Holes and Fissures 
 

Repairing of holes and fissures at the shower frame, groundsheet or roof 
can be done with the included repair set according to its instructions. 

 

5.4 Valve Check 

 

Isn’t a valve airtight anymore, may be dirt under the gasket, which can 
removed as described: 

a)  Exhaust all air. 
b)  Fill valve with warm soap-water. 
c)  Press valve tappet: in- and deflation valve from the front, the relief 

valve must be pressed from the back through the air beam right in the 
middle. 

d)  The soap-water should flow into the air beam. 
e)  Inflate the tube until the valve opens definitely. Check in- and deflation 

valve if they are tight. 

f)  If the valve still not working properly, it probably needs to be changed. 

 

Summary of Contents for care ARZ Decon

Page 1: ...ata 2 3 Set up Instructions 3 3 1 Unpacking and unfolding 3 3 2 Inflating 3 3 2 1 Using the hand Pump 3 3 2 2 Using the Electrical Blower 3 3 3 Final Work to do 4 3 4 Important Information 4 3 5 Pictu...

Page 2: ...cabin Electric fan Extra Hand shower Tub fixed to the shower 2x2m or 2x3m Reinforced windows 2 Technical Data Changes in the construction and fabric change weight and packing volume ARZ Decon 2x2m ARZ...

Page 3: ...ve is closed The valve inside must be even with the valve surface c Close opened valve by pushing down and turning the valve tappet clockwise d Fill the tube system with air Lifting the shower air tub...

Page 4: ...lectrical blower longer than needed for the inflation process may cause overheating Do not use continually for more than 5 minutes to avoid overheating 3 3 Final Work to Do a Fix shower with T pegs 30...

Page 5: ...Tel Internet 1800 28 44 46 www carecompany com au Page 5 7 Manual ARZ Decontamination showers 2021 Version 02 3 5 Pictures of Inflation Process Couplings Suction hose...

Page 6: ...s to open The air needs about 5 to 10 minutes to exhaust completely d Exhaust the air thoroughly with the hand pump or electrical blower 4 2 Folding and Packing a Spread out shower roof even and flat...

Page 7: ...valves the same way as above In case that a valve is not airtight anymore please follow step 5 4 5 3 Repairing of Holes and Fissures Repairing of holes and fissures at the shower frame groundsheet or...

Reviews: