background image

TABLE OF CONTENTS

SPECIFICATIONS ...................................................................................................................................COVER

TABLE OF CONTENTS .....................................................................................................................................1

1. INSTALLATION ...........................................................................................................................................1

1.1

RECEIVING........................................................................................................................................1

1.2

UNPACKING ......................................................................................................................................2

1.3

INSTALLATION ..................................................................................................................................2

1.4

CONNECTING TO ELECTRICAL POWER .......................................................................................2

1.5

CONNECTING SUPPLY LINES TO SOURCES ................................................................................2

2. SCHEDULED MAINTENANCE ...................................................................................................................3

2.1

DAILY .................................................................................................................................................3

2.2

WEEKLY.............................................................................................................................................3

2.3

MONTHLY ..........................................................................................................................................3

2.4

EVERY SIX MONTHS........................................................................................................................3

2.5

YEARLY..............................................................................................................................................3

3. DISPENSER CLEANING AND SANITIZING ..............................................................................................3

3.1

AMBIENT PROCESS.........................................................................................................................3

3.2

VALVES ..............................................................................................................................................4

4. TROUBLESHOOTING.................................................................................................................................4

4.1

WATER LEAKAGE AROUND NOZZLE .............................................................................................4

4.2

LEAKAGE BETWEEN UPPER AND LOWER BODIES.....................................................................4

4.3

MISCELLANEOUS LEAKAGE ...........................................................................................................4

4.4

INSUFFICIENT WATER FLOW..........................................................................................................4

4.5

INSUFFICIENT SYRUP FLOW..........................................................................................................5

4.6

ERRATIC RATIO ................................................................................................................................5

4.7

NO PRODUCT DISPENSED .............................................................................................................5

4.8

WATER ONLY DISPENSED; NO SYRUP; OR SYRUP ONLY DISPENSED, NO WATER...............5

4.9

VALVE WILL NOT SHUT OFF ...........................................................................................................5

4.10 EXCESSIVE FOAMING .....................................................................................................................5

4.11 COMPRESSOR DOES NOT START (NO HUM), BUT CONDENSER FAN 

MOTOR RUNS...................................................................................................................................6

4.12 COMPRESSOR STARTS AND CONTINUES TO RUN UNTIL FREEZE UP

AND WILL NOT CUT OFF .................................................................................................................6

4.13 COMPRESSOR DOES NOT START BUT HUMS .............................................................................6

4.14 COMPRESSOR STARTS BUT DOES NOT SWITCH OFF START WINDING .................................6

4.15 COMPRESSOR STARTS AND RUNS A SHORT TIME BUT SHUTS OFF 

ON OVERLOAD .................................................................................................................................6

4.16 COMPRESSOR AND CONDENSER FAN MOTOR WILL NOT START AFTER 

FIVE (5) MINUTE POWER OFF DELAY (LANCER EIBC 

EXPORT ONLY

) .....................................6

4.17 COMPRESSOR AND CONDENSER FAN MOTOR WILL NOT START AFTER 

FIVE (5) MINUTE POWER OFF DELAY (LANCER EIBC 

USA ONLY

).............................................6

4.18 WARM DRINKS..................................................................................................................................6

5. ILLUSTRATIONS, PARTS LISTINGS, AND WIRING DIAGRAMS ............................................................7

5.1

500 CED WIRING DIAGRAM, 220-240V/50-60HZ, LANCER ELECTRONIC ICE 

BANK CONTROL (INTERNATIONAL ONLY).....................................................................................7

5.2

500 CED WIRING DIAGRAM, 115V/60HZ, LANCER ELECTRONIC ICE BANK 

CONTROL AND CONTROL HOUSING CONNECTIONS (USA ONLY) ............................................8

5.3

CABINET ASSEMBLY...................................................................................................................9-10

5.4

COMPRESSOR DECK ASSEMBLY ...........................................................................................11-12

1. INSTALLATION

1.1

RECEIVING

Each unit is completely tested under operating conditions and thoroughly inspected before 
shipment.  At the time of shipment, the carrier accepts the unit and any claim for damage must be
made with the carrier.  Upon receiving unit(s) from the delivering carrier, carefully inspect carton for
visible indication of damage.  If damage exists, have carrier note same on bill of lading and file a
claim with the carrier.

1

Summary of Contents for 500 Series

Page 1: ...IG 4 22 kg cm2 4 14 BAR CARBON DIOXIDE CO2 REQUIREMENTS Minimum pressure of 70 PSIG 4 92 kg cm2 4 83 BAR Maximum pressure of 80 PSIG 5 62 kg cm2 5 52 BAR ICE BANK WEIGHT 16 pounds 17 26 kg WATER BATH...

Page 2: ...SSOR STARTS BUT DOES NOT SWITCH OFF START WINDING 6 4 15 COMPRESSOR STARTS AND RUNS A SHORT TIME BUT SHUTS OFF ON OVERLOAD 6 4 16 COMPRESSOR AND CONDENSER FAN MOTOR WILL NOT START AFTER FIVE 5 MINUTE...

Page 3: ...e top grill A Position dispenser on counter B Remove bonnet from the dispenser C Remove insulation strip from in front of refrigeration deck Fill tank with water until water comes out of overflow tube...

Page 4: ...s and or brix changes B Remove the bonnet and check the level of water in the water bath Replenish as required and replace the bonnet 2 3 MONTHLY A Unplug the dispenser from power source B Remove the...

Page 5: ...g lever 3 Wearing sanitary gloves remove drain and air dry the nozzle and diffuser 4 Wearing sanitary gloves replace diffuser and twist nozzle into place 5 Draw drinks to flush the chlorine solution f...

Page 6: ...ounting block or syrup supply and open shutoffs slightly and check water and syrup flow If no flow check dispenser for freeze up or other problems 4 8 Water only dispensed A Water or syrup shutoff on...

Page 7: ...starting relay Be sure to internal overload use correct relay Failure to use switches compressor off correct relay will cause compressor failure 4 15 Compressor starts and A Dirty condenser A Clean th...

Page 8: ...S AND WIRING DIAGRAMS 5 1 500 CED WIRING DIAGRAM 220 240V 50 60HZ LANCER ELECTRONIC ICE BANK CONTROL INTERNATIONAL ONLY TROUBLE CAUSE REMEDY 7 WHEN STARTING UNIT OR IF CURRENT IS INTERRUPTED THERE IS...

Page 9: ...ANCER ICE BANK CONTROL PROBE RELAY FAN MOTOR COMPRESSOR OVERLOAD C M S L M S LABEL WIRING 500 2500 CED 06 0031 01 WHEN STARTING UNIT OR IF CURRENT IS INTERRUPTED THERE IS A FIVE 5 MINUTE DELAY BEFORE...

Page 10: ...9 4 1 2 22 6 7 8 16 22 11 21 23 24 10 14 12 13 17 3 27 18 15 22 5 24 25 26 16 15 22 19 20 5 3 CABINET ASSEMBLY 9...

Page 11: ...Splash Plate Extended No Drip Tray 15 51 0494 01 Support Leg 16 81 0112 Leg Adjustable 17 04 0529 Screw 8 32 x 0 750 18 08 0100 Tubing 19 12 0097 Keylock Switch Optional 20 07 0405 Hole Plug Optional...

Page 12: ...11 2 4 4 7 3 6 5 29E 29B 29D 29C 29A 23 16 22 17 27 28 20 30A 30B 30C 6 30 18 13 9 4 31 14 31 10C 10A 10D 10B 19 8 1 4 24 29 10 21 12 32 26 25 11 15 33 34 5 4 COMPRESSOR DECK ASSEMBLY...

Page 13: ...9 03 0028 Retainer Clip Evaporator Coil 20 06 0431 Label 115V 60Hz 1 4 HP 06 0461 Label 230V 50Hz 1 4 HP 06 0744 Label 240V 60Hz 1 4 HP 21 47 0746 02 Low Side Tube 22 04 0237 Screw 8 32 X 250 23 04 00...

Page 14: ...13 NOTES...

Page 15: ...2666 e mail daniel freser com cn Freser HK Company Ltd Hong Kong Flat A 24 F Houston Industrial Bldg 32 40 Wang Lung Street Tsuen Wan N T Hong Kong Phone 852 2408 2595 FAX 852 2408 2605 e mail freserh...

Page 16: ...A4 7ER England Phone 44 1895672667 FAX 44 1895637537 e mail court4lancer msn com Hungary H 2100 G d ll Isaszegi t 67 Hungary Phone 36 28 417 179 FAX 36 28416 881 e mail bodolai compuserve com Lancer A...

Reviews: