
PAGE 3
The EOG is factory installed on the filter control valve and is activated by the filter control valve’s factory programmed timing
schedule. The following installation instructions are offered only if needed e.g. field replacement.
1. Mount the EOG to the control valve. A #2 Philips screwdriver will be required.
Installation
a. Install clamp ring into EOG backplate receiver.
b. Install port clip into EOG backplate receiver.
c. Loosen clamp screw, slide clamp over valve injector cap. Rotate
EOG counterclockwise to secure port clip. Tighten clamp screw.
2. Disconnect power to the control valve. Remove the front valve cover from backplate. Release the control board bracket
from backplate.
3. Route the grey control wire from the EOG into valve housing through the hole in the backplate, and through the strain relief
channel above to keep wiring in place.
a. Leave enough wire length to connect to the signal relay terminal block of the control circuit board. Make sure the
wire is flush in the channel for proper bracket installation.
b. Replace the control board bracket into backplate until it “snaps” into place.
4. Secure red wire into RLY 1 terminal, and black wire into +COM terminal on control circuit board.
5. Replace control valve front cover.
6. Plug the supplied wall transformer into a wall outlet. Plug the male DC plug into the female DC jack located at the back of
the EOG.