background image

www.lamtec.de

Sensors and Systems for Combustion Engineering

Operating Instructions

Graphic Customer Interface 

GKI300

Summary of Contents for GKI300

Page 1: ...www lamtec de Sensors and Systems for Combustion Engineering Operating Instructions Graphic Customer Interface GKI300 ...

Page 2: ......

Page 3: ...trical Connections 15 4 4 1 Connection to FMS 16 4 4 2 Connection to ETAMATIC 17 4 4 3 Connection to BT300 18 4 5 Changing the IP Address 18 4 5 1 Default IP Address in the Data Module 18 4 5 2 Default IP Adress in the GKI300 18 5 Commissioning 19 5 1 Commissioning 19 6 Operation 20 6 1 Main Menu 20 6 2 Burner Details 21 6 3 Fuel air Ratio Curves 22 6 4 Load Controller Display 23 6 5 CO O2 Setpoin...

Page 4: ...3 Table of Contents 10 2 Visualisation System has Crashed 36 10 3 Visualisation System Contains no Plant Values 37 10 4 Error Message Website not Available 37 11 Repair 38 12 Disposal Notes 39 ...

Page 5: ...Manual 1 Important Information about the Manual 1 1 Validity of these Instructions The manual is valid for the GKI300 graphic customer interface The GKI300 graphic customer interface is used for the data visualisation of combustion plants ...

Page 6: ... the device lies with the owner or operator provided the device is being improperly operated maintained or serviced by persons who do not have sufficient knowledge or if the device has been handled in a manner that is not compliant with its intended use The design test certificate shall expire if modifications are made to devices that have a design test certificate Inputs and outputs of the device...

Page 7: ...r s attention to the possibility of imminent danger If it is not avoided it may result in death or very serious injury The plant including its surroundings could be damaged CAUTION This draws the user s attention to the possibility of imminent danger If it is not avoided it may result in minor injuries The plant including its surroundings could be damaged NOTICE This draws the user s attention to ...

Page 8: ...stomer interface is the clear display of all im portant plant parameters The following are displayed Starting window with a display of the usual burner values and the existing exhaust gas val ues if pertinent A fault history containing the last 10 faults O2 setpoint curve CO O2 setpoint curve CO O2 learning curve Fuel air ratio curves Burner details with the status of the inputs and outputs Operat...

Page 9: ... the back of the device the following dialogue box appears Fig 3 2 shutdown screen After the shut down button 1 is pressed the GKI300 is shut down properly NOTICE In case of an improper shut down e g due to an interruption of the voltage supply it may occur that the GKI300 no longer starts up properly If the system does not start together with the visualisation system see Chapter 10 1 Visualis ati...

Page 10: ...9 3 Product Description 3 2 Technical Data Fig 3 3 Views GKI300 Fig 3 4 Dimensions GKI300 ...

Page 11: ...Panel rack and swivel arm VESA 100x100 mm 3 93 x3 93 in Dimensions HxWxD 202x235x31 mm 7 95 x9 25 x1 22 in Weight 2 2 kg 4 85 lb Touch screen Resistive 4 wire CPU processor Intel Atom N2600 optional N2800 Memory 2GB 533 MHz DDR3 SO DIMM pre installed 4GB max f N2800 Power supply 8 36 V Power consumption 7 W Accessories Panel installation kit Obligatory for panel installation Operating condition Am...

Page 12: ...ipment Fig 3 5 Scope of supply of GKI300 1 GKI300 2 Power supply unit 3 Mains connecting cable 4 Driver CD for WinXP Win7 Win8 Linux 32Bit 64Bit 5 W LAN antenna 6 Touch pen 7 Mounting clamps for assembling in control cabinet optional ...

Page 13: ...lation and mounting on suitable holders such as VESA 100 NOTICE IP40 type of protection is guaranteed only in case of panel installation Mounting on holders is permitted only in dry rooms 4 2 Panel Installation Option Fig 4 1 Fastening using the panel installation kit 1 Fastening clamps 2 pieces 2 Screw 4 x M4 3 Panel front sheet of control cabinet or rack ...

Page 14: ... case of panel installation Attachment of the GKI to the front of the switch cabinet using the 2 fastening clamps 1 Positioning of the GKI300 in the plate cut out created previously according to dimensional specifications 2 Hook the fastening clamps onto the back ...

Page 15: ...tandards Association holder Fig 4 3 Mounting of the GKI300 to a VESA 100 holder Using 4 screws M3 the VESA 100 holder is mounting to the back of the Gerät NOTICE The use of a VESA 100 holder is suitable only in dry rooms 1 4 x screw holes for the fastening of the VESA 100 holder 2 Example of a VESA 100 holder with pedestal not included in the scope of supply ...

Page 16: ... prevented using suitable measures Suitable measures include the following Wear an ESD Grounding Wrist Strap Touch grounding objects between individual work steps When working with a disassembled device use a grounded antistatic foundation Fig 4 4 Connections on the back of the device 1 Audio input 2 Audio output 3 W LAN antenna 4 HDMI port 5 10 100 1000Mbit RJ45 port 6 4 x USB 2 0 7 1 x serial in...

Page 17: ...cable type 663R0105 is used Alternatively a connection through an intermediately switched hub or switch is possible In this case commercial non crossed over Ethernet cable must be used Connection diagram of the FMS with terminal designation 1 Communication processor 24V 2 Data module 24V 3 GKI300 12V 4 Ethernet line cross over 5 FMS 6 Connection between FMS and the communications processor ...

Page 18: ...oss over Ethernet cable type 663R0105 is used Alternatively a connection through an intermediately switched hub or switch is possible In this case commercial non crossed over Ethernet cable must be used Connection diagram of the ETAMATIC ETAMATIC OEM with terminal designation 1 Connection between ETAMATIC and the data module 2 Data module 3 GKI300 4 Ethernet line cross over 5 ETAMATIC ETAMATIC OEM...

Page 19: ...fault IP Address in the Data Module The default IP address of the data module on delivery is 192 168 1 250 For changing the IP address you have to connect the data module directly to the network adapter of your computer use a cross over network cable You must configure temporarily the IP settings of the net work adapter of your computer to the same sub net as the data module For further informatio...

Page 20: ... of the GKI300 Fig 5 1 Commissioning the GKI300 The visualisation system starts automatically the connection with the data module is estab lished in the same manner NOTICE Booting the system may take several minutes If the system does not start together with the visualisation system see Chapter 10 Correcting Faults ...

Page 21: ... and submenu NOTICE Do not use the menu item 7 for navigation within the visualisation system The menu item 7 ends the visualisation system and the user interface of the operating sys tem appears In this case the visualisation must be started again via Icon VC GUI with double click 1 Refresh 2 Burner operation screen 3 Fuel air ratio curves 4 Load controller 5 CO O2 control 6 NEMS fault indicator ...

Page 22: ...21 6 Operation 6 2 Burner Details Fig 6 2 Burner details 1 Return to the main menu 2 Data setting 3 Status of the digital inputs 4 Status of the digital outputs ...

Page 23: ...io Curves Fig 6 3 Fuel air ratio curves 1 Return to the main menu 2 Operating hours and start up counter 3 Parameter list 4 Fault history shows the last 10 faults of the connected device 5 Version information of the connected devices ...

Page 24: ...ivated 1 Return to the main menu 2 Refresh display 3 Current actual value 4 Switch on point Actual value below this point firing rate controller starts 5 Shut down Point Actual value above this point burner runs in base firing rate 6 Switch off point Actual value above this point burner shuts down 7 Max setpoint value 8 Current setpoint value dependent on the input signal of control by atmospheric...

Page 25: ...r CO control exists in the system Fig 6 5 CO O2 setpoint curve 1 Return to the main menu 2 CO O2 status display 3 CO O2 fault history 4 Selection of the O2 setpoint curve with CO limit only if CO control is active 5 O2 learning curve 6 CO learning curve ...

Page 26: ...25 6 Operation 6 6 NEMS Display Only if the NEMS fault indicator exists in the system Fig 6 6 NEMS display 1 Return to the main menu 2 List of NEMS events ...

Page 27: ... is in operation a firing rate value can be preselected here and the firing rate value can be overwritten externally or by the load controller 3 Sends a reset signal to the connected device 4 Sends a reset signal to the CO O2 control Only available from data module software version V2 5 Sends a deactivation command to the connected device Only available from data module software version V2 6 Close...

Page 28: ...ntly available languages are German English Chinese Korean Russian Additional languages in preparation The currently available languages can be requested at info lamtec de 6 8 1 Change Language To change the present language proceed as follows 1 Switch the graphics to the main menu display 2 End the graphic display Fig 6 8 Main menu screen ...

Page 29: ...h double click than wait until the message VISIOCON TROL server shut down appears and the text window closes again 6 Now select the desired language by double clicking the country flag Wait until the text window closes again 7 Activate Icon Start VC with double click and wait until the text window closes again 8 Start the graphic display via Icon VC GUI with double click Start up may take several ...

Page 30: ...Fig 6 12 GKI shutdown screen 1 Press Shut Down 1 The device shuts off NOTICE Always shut down the system in the described manner as it may otherwise occur that the visualisation system does not start automatically at the next start up In case that the visualisation does not start automatically See Chapter 10 1 Visualis ation System does not Start ...

Page 31: ...ternative Shut Down Methods Alternative shut down methods Fig 6 13 main Menu If the On Off button is not accessible proceed as follows 1 End the visualisation system with X button 2 Confirm the following safety query with OK ...

Page 32: ...ating system user interface appears Fig 6 14 Operation system surface GKI300 1 Activate the symbol Quit System at the top right The shut down menu appears Fig 6 15 GKI shut down screen 1 Press Shut Down 1 The device shuts off ...

Page 33: ...32 7 Request GKI300 Screen from Other Network Computers 7 Request GKI300 Screen from Other Network Computers It is not possible to request the GKI300 screen from other network computers ...

Page 34: ...e internal components and modules must not be cleaned or come into contact with moisture Do not use sprays to clean the external parts of the casing Using chemicals can cause skin irritations and allergies Observe the manufacturers safety instructions During cleaning do not smoke or consume food at the workstation To clean the LCD screen and plastic frame use only a dry or slightly moistened soft ...

Page 35: ...mounting 663R9041W W wall mounting Power supply unit 663R9044 SATA connecting piping XXX Screw set XXX Stylus XXX User manual and driver CD XXX Cross over Ethernet cable connection between data module and GKI300 663R0105 Data module 663R0411 Fastening clamps for control cabinet installation 663R9042 ...

Page 36: ... Correcting Faults 10 Correcting Faults 10 1 Visualisation System does not Start 1 Manual start of the visualisation system a Activate Icon VC GUI double click Fig 10 1 GKI300 operating system user interface ...

Page 37: ...ystem has Crashed Start visualisation again Fig 10 2 GKI300 operating system user interface 1 Activate Icon Stop VC double click 2 Wait until the text window closes 3 Activate Icon Start VC double click 4 Wait 5 Activate Icon VC GUI double click ...

Page 38: ...ad been changed Defective or wrong Ethernet cable connecting between data module and GKI300 Network adapter in the data module or GKI300 is defect Data module or GKI300 is defect Remedy Check IP address on both devices and correct if necessary Check Ethernet data line and exchange if necessary use a cross over Ethernet data ca ble If a fault of the network adapter in the data module or GKI300 or a...

Page 39: ...artner on the LAMTEC Website www lamtec de vertrieb vertrieb weltweit html You have also the possibility to send the device including a fault description to LAMTEC Meß und Regeltechnik für Feuerungen GmbH Co KG Wiesenstraße 6 69190 Walldorf Baden Germany NOTICE In case of warranty claims always contact your dealer or plant fitter ...

Page 40: ...39 12 Disposal Notes 12 Disposal Notes All parts of the GKI300 system are to be treated as electrical scrap and disposed of according to the local regulations ...

Page 41: ...40 12 Disposal Notes ...

Page 42: ... Co KG Wiesenstraße 6 D 69190 Walldorf Telefon 49 0 6227 6052 0 Telefax 49 0 6227 6052 57 info lamtec de www lamtec de Print no DLT7106 17 aEN 005 The information in this publication is subject to technical changes Printed in Germany Copyright 2017 ...

Reviews: