![Lamborghini Caloreclima LMB G 300 Instructions For Installation, Use And Maintenance Manual Download Page 78](http://html1.mh-extra.com/html/lamborghini-caloreclima/lmb-g-300/lmb-g-300_instructions-for-installation-use-and-maintenance-manual_3436167078.webp)
78
GB
Ignition diagram
Ignition phase with sealing control enabled
CS
MT
PA
TR
VS
VL
FL
EC
na
nc
.
M
AX
MIN
0
SA
OFF
A
C
CENSIONE / IGNITION
APRINDERE / ЗА
ЖИГ
АНИЕ / ENCENDIDO
FUNZIONA
MENT
O / FUNC
TIONING
FUNC
ŢIONARE / Р
АБ
О
ТА / FUNCIONA
MIENT
O
OFF
ВЫК
Л
.
tv1-a
tvS
-a
tvS
-c
tv1-
c
tpv
tpr
ac
c
ts
tr
eg
tpost
CS Functioning request consents FAN Fan motorI GN Ignition transformer VS Safety valve V1 First stage valve V2 Second stage valve FL
Flame signal
AL
Block signal
SA
Air
damper
tpv Pre-ventilation timetpra cc Pre-ignition timets Safety time treg Functioning regulator management delay tv1-a First stage valve opening time tvs-c Safety valve sealing check time tvs-a Safety valve opening time tv1-c W
ork valve sealing check time