GASTER N 119 ÷ 289 AW
27
cod. 3541F272 - Rev. 00 - 06/2018
EN
Boiler lighting
•
Open the gas cock ahead of the boiler.
• Vent the air from the pipe ahead of the gas valve.
•
Turn on or insert any switch or plug ahead of the boiler
• Turn the boiler switch (pos. 8 - fig.
1) to “On”.
• Turn the knob 7 (
Fig. 1) to a value above 50°C and that of a possible room thermostat to the desired temperature setting. The burner
will ignite and the boiler starts working automatically, controlled by its adjustment and safety devices.
If the burners fail to ignite and the indicator button lights up after correctly carrying out the lighting procedure, wait about 15
seconds and then press the above-mentioned button. The reset controller will repeat the ignition cycle. If the burners do not light
after the second attempt, consult par. 3.4 “Troubleshooting”.
In case of a power failure while the boiler is working, the burners will go out and automatically relight when the power is restored.
Checks during operation
•
Check the tightness of the fuel circuit and water systems.
• Check the efficiency of the flue and fume ducts while the boiler is working.
•
Check correct water circulation between the boiler and systems.
•
Check proper ignition of the boiler by performing various tests, turning it on and off with the room thermostat or boiler thermostat.
•
Make sure the fuel consumption indicated on the meter matches that given in the technical data table in section 4.
Turning off
To turn the boiler off temporarily, just turn the boiler switch 8 (fig.
1) to "Off".
To turn the boiler off for an extended period:
• Turn the boiler switch 8 (fig.
1) to "Off";
•
Close the gas cock ahead of the boiler;
•
Disconnect the power to the unit;
To avoid damage caused by freezing during long shutdowns in winter, it is advisable to drain all water from the boiler and the
system; or add a suitable antifreeze to the heating system.
3.3 Maintenance
The following operations must only be carried out by Qualified Personnel.
Seasonal inspection of the boiler and flue
It is advisable to carry out the following checks at least once a year:
• The control and safety devices (gas valve, thermostats, etc.) must function correctly.
•
The fume ducts must be free of obstructions and leaks.
•
The gas and water systems must be tight.
•
The burner and boiler shell must be clean. Follow the instructions in the next section.
• The electrodes must be free of scale and properly positioned (see fig.
12).
•
The water pressure in the system when cold must be approx. 1 bar; otherwise bring it to that value.
• The expansion tank, if present, must be filled.
• The gas flow and pressure must match that given in the respective tables.
•
The circulating pumps must not be blocked.
Safety devices
The
GASTER N 119 ÷ 289 AW
boiler is equipped with devices that ensure safety in case of operation faults.
Manual-reset temperature limiter (safety thermostat)
This device prevents the water temperature in the system from exceeding boiling point. The maximum intervention temperature is 110°C.
Automatic reset of the temperature limiter can only occur with cooling of the boiler (the temperature must fall by at least 10°C) and identi
-
fication and consequent elimination of the problem that caused the shutdown. To reset the temperature limiter, unscrew the cap 3 in fig.
1
and press the button below.
Summary of Contents for GASTER N 119
Page 77: ...GASTER N 119 289 AW 77 cod 3541F272 Rev 00 06 2018 RU 7 1 2 1 1 0 1 5 3 3 1 6 3 4 2 2 1 2 2...
Page 79: ...GASTER N 119 289 AW 79 cod 3541F272 Rev 00 06 2018 RU 2 5 3 C B A 4 C 4 A 5 6...
Page 83: ...GASTER N 119 289 AW 83 cod 3541F272 Rev 00 06 2018 RU 9 10 15 9 A 10 11 D 10 11...
Page 84: ...GASTER N 119 289 AW 84 cod 3541F272 Rev 00 06 2018 RU 12 13 3 4 5 6 7 8 14 14 3 4 5...
Page 85: ...GASTER N 119 289 AW 85 cod 3541F272 Rev 00 06 2018 RU 3 4 12 12 2 2 8 2 2 50 C...
Page 89: ...GASTER N 119 289 AW 89 cod 3541F272 Rev 00 06 2018 RU 4 5 119 136 21...
Page 91: ...GASTER N 119 289 AW 91 cod 3541F272 Rev 00 06 2018 RU 97 107 23...
Page 93: ......
Page 94: ......
Page 95: ......