24
UK
TECHNICAL SPECIFICATIONS
FOCUS PRO
3
3R
6
6R
Output
min
14,5
14,5
26,2
26,2
kW
max
32,2
32,2
64,3
64,3
kW
Flow
min
1,20
1,20
2,20
2,20
kg/h
max
3,50
3,50
5,4
5,4
kg/h
Preheater
-
110
-
110
W
Functioning
On / Off
Fuel
Light oil
Max Viscosity at 20°C
1,5 °E - 6 CSt - 41 sec; R1
Electrical power supply
230/50 o 60 single-phase
V/Hz
Pump calibration
12
12
12
12
bar
Motor
100
100
100
100
W
Max. absorbed power
175
240
175
240
W
Condenser
6,3
6,3
6,3
6,3
μF
Trasformator (voltage / secondary current)
15 / 40
15 / 40
15 / 40
15 / 40
kV/mA
Electric protection rating
20
20
20
20
IP
Noise level *
61
61
61
61
dB(A)
Peso
10
10,1
10
10,1
kg
* Sound pressure measured in the manufacturer’s combustion laboratory, with burner operating on a test boiler
and at maximum output..
INSTALLATION ON TO THE BOILER
Fix flange
2
to the boiler using 4 screws
3
interposing the insulation gasket
4
and the possi
-
ble insulating cord
5
. Insert the burner in the flange so that the draught tube penetrates into
the combustion chamber by the length suggested by the boiler manufacturer. Tighten screw
1
to lock the burner in position.
2
3
5
4
1