Step 7.1
From the platform, install a 2 rung
& 2 rung ladder frame onto the 5
rung frames. Then, clip onto the top
rungs 2 blue diagonal braces. The
other end connects to the rung 3
below on the opposite face. Diagonal
braces always run parallel to the
braces below. Now install another
4 guardrails above the 4 already
in place for when the platform is
relocated.
Step 7.2
Remove the lower 4 guardrails by
using the 3T method or uninstalling
them from the ground. Relocate the
platform to the top rung of the first
frames. A temporary platform can
be placed on the bottom rung of the
tower to help do this. Working off the
new upper platform position, install
a 3 rung main frame and a 3 rung
ladder frame. Clip on 2 more blue
diagonal braces.
Step 7.3
Lower the uppermost platform down
1 rung and relocate the guardrails
into the correct positions using the
3T method. Install another platform
4 rungs above and install 4 guardrails
using the 3T method. Remove the
temporary platform off the bottom
rung of the tower if it was used in
step 7.2. If a 3.9m tower is being
assembled, go to step 10.
Proceed to Step 8
Build Method D
3.9m, 5.9m, 7.9m, 9.9m, 11.9m