68
Machine Set-
Up (Cont’d.):
Should a technician representing Laguna Tools not be able to come to the site and work on the machines due to the lack of
preparedness or inoperable equipment per the above and/or beyond Laguna Tools control any expenses incurred will be passed
on to you. The customer will cover all expenses incurred during set up and training on the proper use of the machine(s) including
but not limited to: Airfare, Rental Car, Hotel, Parking and/or Toll Fees per Diem, plus $115.50 per hour.
The above points have been read and understood, and the customer will be responsible for any delay and agrees to reimburse
Laguna Tools for any additional expenses incurred.
7.) Prepare adequate supply of materials for practice cutting as well as several 3⁄4” MDF sheets for use as spoil boards (Mat
erial
to be cut and tested on).
8.) Has the person to be trained to work on the machine(s) by our technician read all the instruction manuals prior to set-
up/training?
9.) Make sure the Associates has been trained in the software prior to set-up/training.
Summary of Contents for Smartshop Composite Fabricator 16
Page 32: ...32 Main Screen Button s Flow Main Screen...
Page 53: ...Schematics...
Page 54: ...Schematics Cont d...
Page 55: ...Schematics Cont d...
Page 56: ...Schematics Cont d...
Page 57: ...Schematics Cont d...
Page 58: ...Schematics Cont d...
Page 59: ...Schematics Cont d...
Page 60: ...Schematics Cont d...
Page 61: ...Schematics Cont d...
Page 62: ...Schematics Cont d...
Page 63: ...Schematics Cont d...
Page 64: ...Schematics Cont d...
Page 65: ...Schematics Cont d...
Page 66: ...Schematics Cont d...
Page 72: ...Laguna Tools Warranty...
Page 75: ...Laguna Tools Packaging Laguna Tools RMA Example RMA...
Page 76: ...76 Laguna Tools Packaging Laguna Tools BILL of LADING Example...