HUMMEL
®
01.12.2012
English / Englisch
COMMISSIONING
Commissioning
This section describes the procedure for commissioning the
HUMMEL
®
on site. In order to exclude the possibility of damage and
malfunctions, it is essential to proceed in the sequence outlined
below.
CAUTION!
RISK OF INJURY and RISK OF PROPERTY DAMAGE:
Before working with the machine for the first time, operating
staff must be adequately instructed!
4.1 PREPARING THE MACHINE FOR OPERATION
1
Unpack the machine carefully. The bottom part of the supplied
transport crate makes a useful container for storage or
transportation of the machine (
Section 6, Transport and
storage
). Please ensure that the packaging materials are
responsibly disposed of.
2
Press the lowering lever at the handle downwards (Fig. 2, 1.).
3
Insert the guide tube into the opening in the machine housing
and at the same time insert the upper rod into the lower rod
(Fig. 2, 2).
4
Carefully tighten the wing screw at the lower rod (Fig. 3) and
the wing nut at the machine housing (Fig. 4).
Fig. 2
When inserting the guide tube, make sure that
the upper rod of the lowering mechanism feeds
in correctly!
Fig. 3
After inserting the guide tube, carefully tighten
the wing screw at the lower rod.
Fig. 4
After inserting the guide tube, carefully tighten
the wing nut at the machine housing.
4
12
Summary of Contents for HUMMEL
Page 56: ...HUMMEL 01 12 2012 English Englisch SPARE PARTS 56 11...
Page 58: ...HUMMEL 01 12 2012 English Englisch SPARE PARTS 58 11...
Page 60: ...HUMMEL 01 12 2012 English Englisch SPARE PARTS 60 11...
Page 64: ...HUMMEL 01 12 2012 English Englisch SPARE PARTS 64 11...
Page 66: ...HUMMEL 01 12 2012 English Englisch SPARE PARTS 66 11...
Page 68: ...HUMMEL 01 12 2012 English Englisch NOTES 68...
Page 69: ...HUMMEL 01 12 2012 English Englisch NOTES 69...