24
Dolce Vita
|
RATTAN
above ground pool
Assembly Instructions
&
Owner’s Manual
6.4
Structure Alignment
• Adjust the level of the upper cross beams and fasten the M8x20 bolts
• Use the level alignment bolts to keep the cross beams firm. Use a self drilling screw to fix the beams in place
Legend