5
C
C
H
H
A
A
P
P
T
T
E
E
R
R
2
2
P
P
R
R
E
E
R
R
E
E
Q
Q
U
U
I
I
S
S
I
I
T
T
E
E
S
S
Before you install the filtered enclosure, you need to prepare your
site for installation. You must be certain that the area is level and
of solid construction. In addition, a dedicated source of electrical
power should be located near the installation site to power the
filtered enclosure, and other apparatus. Additionally, the enclosure
should be strategically placed in the lab to provide efficient
workflow.
Carefully read this chapter to learn the requirements for your
installation site:
•
The support, vibration and movement requirements.
•
The location and air current requirements.
•
The exhaust and blower requirements.
•
The electrical power requirements.
•
The space requirements.
Refer to
Appendix B: Purifier
Dimensions
for complete enclosure
dimensions.
Refer to
Appendix C: Purifier Specifications
for complete filtered
enclosure electrical and environmental conditions, specifications
and requirements.
Summary of Contents for 3980200
Page 2: ......
Page 13: ...8 Chapter 2 Prerequisites ...
Page 17: ...12 Chapter 3 Getting Started Figure 3 1 Filtered Enclosure Installation ...
Page 67: ...62 Chapter 7 Accessorizing and Modifying Your Filtered Enclosure ...
Page 82: ...77 Appendix C Filtered Enclosure Specifications C 1 ...
Page 83: ...78 Appendix C Filtered Enclosure Specifications C 2 ...
Page 84: ...79 Appendix C Filtered Enclosure Specifications C 3 ...
Page 85: ...80 Appendix C Filtered Enclosure Specifications C 4 ...
Page 92: ...87 ...
Page 93: ......