user manual
Flashline
Flashline User Manual
page 26
• Check that the rear pins are engaged on both sides of the cabinet. Note: never lift the array without the rear
pins engaged. Regardless of how many people are rigging the array, it is one person’s job to always check that
the angles are set identically and correctly and that pins are fully engaged on both sides of each cabinet.
• The first block of four cabinets is now ready to lift. Check that all links are correctly fitted and secure. Take both
motors up together and lift the cluster clear of the TFS-DOLLY. The fronts of the cabinets will now open up as
the cluster lifts clear of the TFS-DOLLY depending on the angles set between them, creating a gradual smooth
curve to the front of the array.
1
2
#1
#2
#3
#4
#1
#2
#3
#4
• Fit the lower front pins on cabinets #1, #2 and #3 into the holes marked
LOCK
on both sides of the cabinets in
order to lock the array into a rigid structure. Do this now because if left until later it will not be possible to reach
them.
• A spanset and shackle can now be attached to the rear of the TFS-GRID flybar to feed the speaker cabling
through, allowing enough length to allow the cables to reach the lowest cabinet in the final cluster.
• Connect the first NL8 cable run to cabinet #1 and link down to the next two cabinets, making a total of three
cabinets on the first NL8 run. Connect the second NL8 cable run to cabinet #4.