5
Prerequisites
Installation
This type of installation requires an electrical background.
When unpacking contents of the kit, it is crucial to
perform a visual check to confirm that none of the parts
are damaged/broken.
Prior to installation, make sure to disconnect the main
circuit breaker (CB).
Confirm that the charger’s serial number is configured in
NayaxVend under your local distributor/operator.
Make sure to always follow your local electrical regulations.
The Bee Meter installation should only be carried out by a
certified installer.
The below instructions are a guideline and provided for
reference only. You are solely responsible for following all
applicable electrical safety procedures, codes, methods, and
materials provided as per the instructions below.
CAUTION!
!