9
2012/3/2Ver1.1+V1.0
STEP 2.
Attaching the Upper Control Frame to the Main Frame
1.
Thread the wire from the Bike Frame (B) to the Upper Control Frame (C), then place the two frames
together. Insert steel hexagon socket head screws (a), spring washers (b) and flat washers (c)
according to the figures and tighten.
Summary of Contents for DK850BAF01AA
Page 1: ...DK850BAF01AA OWNER S MANUAL...
Page 7: ...6 2012 3 2Ver1 1 V1 0 Assembly Parts...
Page 25: ...24 2012 3 2Ver1 1 V1 0 Program Control Project Figure level...
Page 26: ...25 2012 3 2Ver1 1 V1 0...
Page 27: ...26 2012 3 2Ver1 1 V1 0...
Page 28: ...27 2012 3 2Ver1 1 V1 0...
Page 29: ...28 2012 3 2Ver1 1 V1 0...
Page 30: ...29 2012 3 2Ver1 1 V1 0...
Page 31: ...30 2012 3 2Ver1 1 V1 0...
Page 32: ...31 2012 3 2Ver1 1 V1 0...
Page 33: ...32 2012 3 2Ver1 1 V1 0...
Page 34: ...33 2012 3 2Ver1 1 V1 0...
Page 35: ...34 2012 3 2Ver1 1 V1 0...
Page 36: ...35 2012 3 2Ver1 1 V1 0...