Rigging procedures
c) Lower the enclosure assembly until it rests on the nuts.
The front of the enclosure assembly should press on the screen gasket.
Risk of overloading the suspended ceiling
Do not let the enclosure assembly rest on SB10r-Tilescreen and the suspended ceiling.
8.
Insert security nuts and tighten them against the rigging nuts.
SB10r owner's manual (EN) version 1.1
39
Summary of Contents for SB10r
Page 1: ...SB10r owner s manual EN...