Rigging procedures
9.
Align the barbed push fasteners with the SB10r-inW holes and push the screen into place.
Press the screen around the frame from the center to the ends until the screen is fully pressed against the drywall.
What to do next
If SB10r-Screen needs to be removed, use trim clip removal pliers to remove the barbed push fasteners from SB10r-inW.
26
SB10r owner's manual (EN) version 1.1
Summary of Contents for SB10r
Page 1: ...SB10r owner s manual EN...