
Rigging procedures
F - Stacking K2 on K2-BUMP
min number of operators
2
Procedure
1.
Prepare a block of 4 K2. Refer to
(p.69).
2.
Preset the inter-enclosure angles. Refer to
B - Preset the inter-enclosure angles
(p.73).
3.
Prepare the K2 block top enclosure:
a) Take out and lock the rear and front rigging arms.
b) Dene the K2 stack site angle with the rear rigging arm.
For the top enclosure of the stack, select a value between 0.25 and 7.5 and subtract 3 to obtain the nal site
angle. For the other enclosures, select the angle normally.
Final site angle for top enclosure
authorized angles
nal site angles
0.25°
-2.75°
1°
-2°
2°
-1°
7.5°
4.5°
3°
0°
4°
1°
5°
2°
-2.75°
0°
+2°
+1°
+4.5°
-2°
-1°
K2 owner's manual (EN) version 1.1
85
Summary of Contents for K2
Page 1: ...K2 owner s manual EN ...
Page 82: ...Rigging procedures 5 Pin the arms 82 K2 owner s manual EN version 1 1 ...
Page 142: ...Corrective maintenance 3 Remove the HF driver assembly 142 K2 owner s manual EN version 1 1 ...
Page 147: ...Corrective maintenance K2 owner s manual EN version 1 1 147 ...
Page 182: ...Pickup points guidelines 182 K2 owner s manual EN version 1 1 ...