Rigging procedures
Procedure
References
5.
Position and attach a block of four K2 enclosures under the array.
J - Attaching a block of four K2 under K2
(p.100)
Verify that the rigging arms at the back are secured by pins and
that no yellow label is visible on the front.
6.
Repeat the two previous steps until the array is complete.
7.
If necessary, implement a pullback with K2-RIGBAR.
N - Using a K2-RIGBAR to implement a
(p.120)
8.
Raise the array to its nal trim height.
66
K2 owner's manual (EN) version 1.1
Summary of Contents for K2
Page 1: ...K2 owner s manual EN ...
Page 82: ...Rigging procedures 5 Pin the arms 82 K2 owner s manual EN version 1 1 ...
Page 142: ...Corrective maintenance 3 Remove the HF driver assembly 142 K2 owner s manual EN version 1 1 ...
Page 147: ...Corrective maintenance K2 owner s manual EN version 1 1 147 ...
Page 182: ...Pickup points guidelines 182 K2 owner s manual EN version 1 1 ...