Rigging procedures
K2 enclosures under K2-RIGBAR
Final check
After the setup, always verify no yellow labels are visible on the front and on both sides of the array.
Space between pullback rigging points
The space between the two lifting points used for this conguration must be aligned with the array pickup points.
The deployment load-bearing lines must be parallel to each other.
under K2-RIGBAR
under K2-BAR
Procedure
References
1.
Prepare all the blocks of 4 K2 necessary to build the array.
(p.69)
2.
Preset the inter-enclosures angles.
B - Preset the inter-enclosure angles
(p.73)
3.
Attach the K2-RIGBAR on the block of four K2.
I - Attaching a block of four K2 under K2-
(p.97)
4.
Lift the array so you can position another block of four K2 under it.
Verify that no yellow label is visible on both sides of the array.
K2 owner's manual (EN) version 1.1
65
Summary of Contents for K2
Page 1: ...K2 owner s manual EN ...
Page 82: ...Rigging procedures 5 Pin the arms 82 K2 owner s manual EN version 1 1 ...
Page 142: ...Corrective maintenance 3 Remove the HF driver assembly 142 K2 owner s manual EN version 1 1 ...
Page 147: ...Corrective maintenance K2 owner s manual EN version 1 1 147 ...
Page 182: ...Pickup points guidelines 182 K2 owner s manual EN version 1 1 ...