Beijing Kystar Technology Co., Ltd.
50
7.4
、
Master-slave linkage
Function: When multiple kommanders need to achieve simple synchronous control,
master-slave plan linkage can be used. This function mainly meets the user's
requirements for synchronously controlling playback (play, pause, stop, black screen,
lock, mute) and synchronous switching plans.
Prerequisites for the function: The user needs to edit the project files for each
kommander. When the event starts, the user needs to start the project in advance and
ensure that the slave works in slave mode, and the canvas is in real-time mode.
Slave: indicates that the current device works on the slave. Can be connected by the
master, and will receive and execute commands sent by the master.
Master: indicates that the current device works on the master. You can set up slave
management to send commands to the connected slave.
(1)
Slave connection setting: Set the working mode of the program as the slave through
the menu "Settings-System Settings".
Plan synchronization: When the device works on the slave, this property can be
set to determine the processing method after the slave receives the plan switch command.
Synchronize by serial number: It means synchronize according to the sequence
number of the plan. If the master sends a command to switch to the third plan in the
third group, the slave also executes the switch plan to the third plan in the third group. If
there is no such plan, it will not be ignored.
Synchronization by name: indicates that the synchronization is performed
according to the name of the plan. If the master sends a command to switch to "Plan A",
the slave also switches to "Plan A", and the "Scheme A" in the slave project is ignored.
(
2
)
Master connection settings