
2FD/2FF/2FG
1-3-55
Initialization procedure after installation of facsimile system
1. Insert the copier power plug to the wall outlet
and turn the power switch on.
2. Run maintenance item U601.
3. Enter a destination code using the numeric
keys (refer to the destination code list) and
then press the start key.
* Enter a destination code with three digits.
4. Enter the OEM code (000) and then press the
start key.
5. Confirm that the display is changed as shown
in the illustration.
* At the position of @, the version number of
the software is displayed.
6. Press the cursor key to change the display to
maintenance item U602.
7. Press the start key and confirm that the
display is changed as shown in the
illustration.
* At the position of @, the version number of
the software is displayed.
8. After completing the installation, run a
communications test to confirm that the fax
system is working correctly.
Japan
Australia
Hong Kong
Indonesia
Israel
Malaysia
New Zealand
Peru
Philippines
Middle East
Singapore
Code
000
009
080
084
088
108
126
136
137
152
156
South Africa
Thailand
U.S.A.
South America
Saudi Arabia
CTR21 (European nations)
Italy
Germany
Spain
U.K.
Netherlands
159
169
181
242
243
253
Code
Code
Destination
Destination
Destination
Sweden
France
Austria
Switzerland
Belgium
Denmark
Finland
Portugal
Ireland
Norway
Taiwan
253
254
INI. KEEP DATA
COMPLETED XXX 000
INI. KEEP DATA
COMPLETED V@.@@
SELECT THE MAINTENANCE NUMBER.
Initial keep data U601
INI. SHIP DATA
COMPLETED XXX 000
INI. SHIP DATA
COMPLETED V@.@@
SELECT THE MAINTENANCE NUMBER.
Initial ship data U602
Figure 1-3-130
Figure 1-3-131
Summary of Contents for AD-63
Page 340: ...AD 63...
Page 343: ...3CX 1 1 2 1 1 2 Part names Figure 1 1 1 Duplex unit...
Page 344: ...3CX 1 1 3 1 1 3 Machine cross section Figure 1 1 2 Paper path Duplex unit...
Page 360: ...DF 78...
Page 363: ...3B5 1 1 2 1 1 2 Part names Figure 1 1 1 1 Intermediate tray 2 JAM release lever 3 Eject tray...
Page 397: ...J 1402...
Page 400: ...3B6 1 1 2 1 1 2 Part names Figure 1 1 1 1 Job separator tray 2 LED...
Page 401: ...3B6 1 1 3 1 1 3 Machine cross section Figure 1 1 2 Paper path...
Page 402: ...3B6 1 1 4 1 1 4 Drive system Figure 1 1 3 1 Gear 20 2 Gear 28 3 Gear 28 4 Eject roller gear...
Page 413: ...PF 70...
Page 415: ...1 1 2 3CC 2 4 Appendixes Timing chart No 1 2 4 1 Timing chart No 2 2 4 2 Wiring diagram 2 4 3...
Page 417: ...3CC 1 1 2 1 1 2 Parts names 1 Upper drawer 2 Lower drawer 3 Desk left cover Figure 1 1 1 3 1 2...
Page 418: ...3CC 1 1 3 1 1 3 Machine cross section Paper path Figure 1 1 2 Machine cross section...
Page 450: ...RA 1...
Page 452: ...3CP 1 1 1 1 1 1 Part names Figure 1 1 1 Switchback unit Switchback unit open close lever...
Page 453: ...3CP 1 1 2 1 1 2 Machine cross section Figure 1 1 2 Paper path Switchback unit...
Page 470: ...PF 75...
Page 472: ...1 1 2 5FF 2 4 Appendixes Timing chart No 1 2 4 1 Timing chart No 2 2 4 2 Wiring diagram 2 4 3...
Page 475: ...5FF 1 1 3 1 1 3 Machine cross section Paper path Figure 1 1 3 Machine cross section...
Page 513: ......