16
. INSTRUMENT/SWITCHES/LIGHTS
16-3
ZX / SCOUT
INSTALLATION
The installation sequence is the reverse of
removal.
OIL METER
INSPECTION
Remove the met-in box. (
Ö
12-4)
Remove the frame body cover. (
Ö
12-4)
Disconnect the oil meter wire connectors
and remove the oil meter. Keep the oil
meter float at the lower position.
Measure the resistances between the wire
terminals as
c
and
d
shown in the left
figure.
Wire Terminals
Resistance
Green/Red(+) Black(-) 5 16
Ω
Green(-) Black(+)
∞
Oil Meter Operation Inspection
Connect the oil meter wire connectors and
turn the ignition switch ON.
Measure the resistance between the wire
terminals with the float at upper position.
Green/Red(+) Black(-) About
340
Ω
Retainer
Oil Meter
Light OFF
Light ON
G
B
G/R
G
B
Float
c
d
4.5
±
1.0mm
Summary of Contents for ZX/SCOUT 50
Page 15: ...2 GENERAL INFORMATION 2 11 ZX SCOUT SC10AS WIRING DIAGRAM ...
Page 43: ...3 INSPECTION ADJUSTMENT 3 12 Headlight Adjusting Bolt ...
Page 45: ...4 LUBRICATION SYSTEM 4 1 ZX SCOUT 50 LUBRICATION SYSTEM ...
Page 56: ...5 ENGINE REMOVAL INSTALLATION 5 5 ZX SCOUT ...
Page 58: ...6 CYLINDER HEAD CYLINDER PISTON 6 1 ZX SCOUT Torque 1 1 1 7kg m cold Torque 1 5 1 7kg m ...
Page 93: ...9 FINAL REDUCTION 9 1 ZX SCOUT ...
Page 102: ...10 CRANKCASE CRANKSHAFT 10 1 ZX SCOUT Torque 0 8 1 2kg m ...
Page 111: ...11 CARBURETOR 11 1 ZX SCOUT ...
Page 125: ...12 FRAME COVERS 12 1 ZX SCOUT ASSEMBLY DRAWING ...
Page 154: ...14 REAR WHEEL REAR BRAKE REAR SHOCK ABSORBER 14 1 ZX SCOUT 4 5kg m 3 0kg m 11 0kg m ...