21. EEC SYSTEM
21-9
Flow Rate of the Canister Vacuum
Valve
1. Using a vacuum pump connecting
to the vacuum tube of canister and
apply
45m/mHg
of
negative
pressure.
2. Apply pressure to the emission
control valve of canister, if the flow
rate above 9.4 liters per minute
that means the valve is in good
condition, otherwise the canister
should be replaced.
Always using the pump by manual,
do not apply high pressure for
testing to prevent the valve from
malfunction.
6.3.
Installation of canister
1. Installation is the reverse order to the
dismantling.
2. Connect the tubes and circlips firmly.
The tube should not be wrenched or
crashed and never refit the canister.
Canister
Summary of Contents for AHG1
Page 3: ...1 Quick Reference 1 2 1 Engine Frame Serial Number Frame Serial Number Engine Serial Number ...
Page 14: ...1 Quick Reference 1 13 8 General Troubleshooting Engine lacks power 8 1 ...
Page 15: ...1 Quick Reference 1 14 ...
Page 16: ...1 Quick Reference 1 15 Engine will not stat or is hard to start 8 2 ...
Page 17: ...1 Quick Reference 1 16 Poor handling 8 3 ...
Page 18: ...1 Quick Reference 1 17 Poor performance at high speed 8 4 ...
Page 19: ...1 Quick Reference 1 18 Poor performance at low and idle speed 8 5 ...
Page 20: ...2 External components Exhaust pipe 2 0 2 ...
Page 21: ...2 External components Exhaust pipe 2 1 ...
Page 57: ...4 LUBRICATION SYSTEM 4 1 Lubrication System ...
Page 66: ...5 ENGINE 5 1 Engine 1 ENGINE REMOVAL INSTALLATION 4 1 1 Removal 4 1 2 Installation 6 ...
Page 73: ...6 CYLINDER HEAD VALVE 6 2 1 SCHEMATIC DRAWING ...
Page 87: ...7 CYLINDER PISTON 7 2 1 SCHEMATIC DRAWING ...
Page 97: ...8 DRIVE DRIVEN PULLEYS 8 2 1 SCHEMATIC DRAWING ...
Page 111: ...9 FINAL REDUCTION 9 2 1 SCHEMATIC DRAWING ...
Page 122: ...10 A C GENERATOR STARTER CLUTCH Downtown 125i 10 2 SCHEMATIC DRAWING ...
Page 130: ...11 Crank Case Crank Shaft 11 2 1 Schematic Drawing ...
Page 134: ...11 Crank Case Crank Shaft 11 6 Remove the oil seal from the left crankcase ...
Page 156: ...14 FRONT ASSEMBLY 14 2 1 SCHEMATIC DRAWING ...
Page 157: ...14 FRONT ASSEMBLY 14 3 ...
Page 176: ...15 REAR ASSEMBLY 15 2 1 SCHEMATIC DRAWING ...
Page 196: ...18 STARTING SYSTEM 18 2 1 Starting System Layout Battery Start Relay Start Motor ...
Page 224: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 5 Pre diagnosis Inspection Chart 1 ...
Page 225: ...20 ANTI LOCK BRAKE SYSTEM ABS 20 6 Pre diagnosis Inspection Chart 2 ...