
Down - Bow
Up - Arch
Top Rail
Cause
Bow in Top Rail
Left Arm
Assembly
Right Arm
Assembly
Cause
Bow in Top Raill
Cause Arch
in
Top Rail
Cause Arch
in
Top Rail
Front View
7. Set goal onto bases in desired location and mark anchor hole locations. Move goal and dig holes a minimum
of 24” in diameter and 20” deep. (NOTE: Areas subject to heavy ground frost may go as deep as 36”.)
8. Attach ground anchors to assembled goal. Set goal in desired installation location with anchors in holes, fill
holes as shown, surrounding anchors with concrete. Make sure goal is plumb and level and let concrete cure.
Side View
Ground Anchor
Flat Washer
Hex Bolt
Stone
Concrete
Concrete
Anchor Hole Detail
(4 places per goal)
20"
MIN
24" MIN
60°
Approx.
Field
Surface
Ground
Anchor
12-3/4"
NZ181 Rev. 07/17/17
***CAUTION***
This goal has been designed to be used for the game of soccer only. Goal posts must be anchored AT ALL TIMES
and shall be secured against overturning. Do not climb on the net or goal framework at any time! All fastenings
must be checked to insure they are fully tightened before and after each use of this product. Goal posts not in use
must be disassembled and properly stored in a safe, secure area (See included Guidelines for Movable Soccer Goal
Safety.). Assembled goal posts should not be left unattended. Remove nets when goals are not in use. Do not use
this equipment during the threat of high winds. Goal posts should be checked for safety before and after each use.
All warning and safety labels included with this product must be visible at all times.
Any modifications to this or any Kwik Goal product will void any and all warranties.