
Run the Acro-HD
2-14
KVAL Acro-HD Operation/Service Manual
5.
Lay the frames on the alignment pads.
6.
Start attaching frames.
a.Unclamp the door by holding down the
Down Limit Override
button while
simultaneously pressing the
Down Pivot
switch foot pedal.
b. Attach the sill to the bottom of the door.
Press
Together
7.
Attach Brick Moulding.
8.
Roll out door to Acrobat and follow
the instructions in “Using the Acrobat
(Option)” on page 2-15.
Note:
If building a Out Swing Door,
engage the Out Swing Pivot
Wheels. See Figure 2- 1 on
page 2- 2 for location of wheels.
Summary of Contents for Acro-HD
Page 4: ...KVAL Acro HD Operation Service Manual ...
Page 22: ...Safety Sign Off Sheet 1 16 KVAL Acro HD Operation Service Manual ...
Page 40: ...Powering Up and Powering Down the Acro HD 2 18 KVAL Acro HD Operation Service Manual ...
Page 48: ...Description of Air Input System 3 8 KVAL Acro HD Operation Service Manual ...
Page 58: ...Troubleshooting with the Status Light Panel 4 10 KVAL Acro HD Operation Service Manual ...
Page 61: ......
Page 62: ......
Page 63: ......