Initial Set up
979-2
11
Electrical Connections Overview
G ro und
M ain P anel
3-Ph ase input
W ithout K erf Saw s
W ith K erf S aw s
S ingle-Phase
H O T
(B lack W ire)
S ingle-Phase
N E U T R A L
(W hite W ire)
3 -Ph ase input
M ain P anel D isconnect
P L C
The main electrical power is connected to the disconnect,
located in the main electrical panel.
NOTE:
The main electrical panel contains the PLC.
The 979-2 requires three phase power. Refer to the plant
layout diagram or the brass information plate to determine
the voltage required. If the 979-2 is equipped with kerf
saws, an additional 120-volt source is required.
Current Requirements:
• 220 volts - 20 amps
• 460 volts - 10 amps
• 120 volts - 22 amps (Kerf saws option only)
Summary of Contents for 979-2
Page 1: ...979 2 Innovation Quality Honesty 979 2 Miter Trim Saw System Reference Published 4 24 07 ...
Page 2: ...979 2 ...
Page 4: ...b 979 2 ...
Page 8: ...f 979 2 ...
Page 10: ...Introduction 2 979 2 ...
Page 20: ...12 979 2 ...
Page 21: ...979 2 13 CHAPTER 2 Operation The following chapters explain normal operation of the 979 2 ...
Page 22: ...Operation 14 979 2 ...
Page 24: ...16 979 2 ...
Page 26: ...18 979 2 ...
Page 36: ...28 979 2 ...
Page 52: ...Maintenance 44 979 2 Grease Points Main Frame Bottom View Bottom View ...
Page 53: ...Lubrication Requirements 979 2 45 Fixed Head ...
Page 54: ...Maintenance 46 979 2 Movable Head Bottom View ...
Page 56: ...48 979 2 ...
Page 57: ...Cut Depth Set up 979 2 49 ...
Page 58: ...50 979 2 ...
Page 59: ...Cut Depth Set up 979 2 51 ...
Page 60: ...52 979 2 ...
Page 64: ...56 979 2 ...
Page 65: ...979 2 57 CHAPTER 5 Troubleshooting ...
Page 87: ...Touch Screen Troubleshooting 979 2 79 Technical Support Contact information ...
Page 92: ...84 979 2 ...
Page 98: ...90 979 2 ...
Page 100: ...92 979 2 ...
Page 102: ...94 979 2 ...