tkna80e1 (2018-08)
19
4
Operation
Put the gauge into operation.
Warm-up time: approx. 1 minute.
4.1
Zeroing the Gauge
The gauge is factory calibrated while "standing upright". It re-
quires no maintenance.
Due to mounting orientation, long time operation or contamina-
tion, a zero drift could occur and zero adjustment may become
necessary.
For adjusting the zero, operate the gauge under the same con-
stant ambient conditions and in the same mounting orientation
as normally.
If the gauge is operated via a controller, the zero of the
whole measuring system has to be adjusted on the
controller: first, adjust the zero of the gauge and then,
the zero of the controller.
4.1.1
Zero Adjus
t
ment
The zero can be adjusted via
•
the button on the gauge, or
•
the digital input "Remote Zero Adjust" (briefly apply the supply
voltage to pin 4.
•
an appropriate controller.